After office building, CM Yogi plans to paint text books in saffron

News Network
November 14, 2017

Lucknow, Nov 14: After getting his office at the sprawling secretariat annexe building painted in saffron colour, Uttar Pradesh Chief Minister Yogi Adityanath has turned his attention towards the text books.

According to sources in the government, the cover pages of the text books for classes up to 8th standard would be coloured saffron from next academic session.

The Basic Education Department has readied a proposal and it was likely to be approved shortly, the sources said.

The books would also have pictures of Adityanath and Minister for Education Dinesh Sharma, sources added. The school bags being carried by the children of the primary classes in the state have already been painted saffron.

Earlier, undeterred by Opposition criticism, the state government had painted all the signboards along the roads in the state in saffron along with the picture of the Minister for PWD Keshav Prasad Maurya.

Adityanath, who is always clad in saffron clothes, had recently got the secretariat building at annexe painted in saffron. The chief minister had been, since taking charge of the state, trying to give government schemes and projects a saffron tint. He also got the state transport corporation buses painted saffron.

Colour of Sun

UP minister Siddharth Nath Singh justified the move saying that saffron was the colour of the Sun also.

The BSP government under Mayawati, during its regime, had dyed government buildings and transport buses blue - the colour the party is associated with. Even the state information department diary was printed blue.

Comments

Jameel
 - 
Wednesday, 15 Nov 2017

This is what happens when idiots with fake degrees appoint uneducated goondas to take the chair of power. the uneducated goonda does it because he can only recognize the colour, nothing else. 

Althaf
 - 
Tuesday, 14 Nov 2017

One of the Stupid Politician that world has ever seen. Let this Yogi to change the color of trees into saffron.. color of Vegetables and fruits , color of roads, water etc... Incredable india and incredable people.

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
February 9,2020

Mumbai, Feb 9: Given the slow progress on the ongoing Rs 38,000-crore capacity expansion at the four largest metro airports, and also the surging traffic, the snaky queues will continue at least till 2023, warns a report.

The four largest airports -- New Delhi, Mumbai, Bengaluru and Hyderabad -- handle more than half of the traffic and are operating at 130 per cent of their installed capacity. These airports are under a record Rs 38,000-crore capex but the capacity will not come up before end-2023, says a Crisil report.

“With the dip in traffic growth largely behind, we expect congestion at the top four airports of New Delhi, Mumbai, Bengaluru and Hyderabad, which handle more than half of the load, to continue till about FY23,” says the report.

Already these airports are operating at over 130 percent of installed capacity, and the ongoing healthy traffic growth this operating rate is expected to rise further in the next 12 months.

“Operationalising of capacities in the following two fiscals will bring down utilisation levels albeit still high at over 90 per cent by fiscal 2023 and that is despite an unprecedented Rs 38,000 crore capex being undertaken by the operators of these airports over five fiscals 2020-24,” says the report.

Despite this unprecedented capex that is debt-funded, ratings are likely to be stable given the strong cash flows expected due to healthy traffic growth, low project risks associated with the capex and improving regulatory environment, notes the report.

“Capacity at these four airports will increase a cumulative 65 per cent to 228 million annually (from 138 million now) by fiscal 2023. However, traffic is expected to grow strong at up to 10 per cent per annum over the same period. Since additional capacities will become operational in phases only by fiscal 2023, high passenger growth will add to congestion till then,” warn the report.

High utilisation will ride on pent-up demand (accumulated in 2019 as traffic was impacted with the grounding of Jet Airways) and one-off issues with new aircraft of certain airlines.

Further impetus will also come from improving connectivity to lower-tier cities and reducing fare difference between air and rail. Increasing footfalls at airports provide a leg-up to non-aero streams such as advertising, rentals, food and beverage and parking, which comprise around half of the revenue of airports already.

These are expected to grow strongly at over 10-12 per cent, also supported by higher monetisation avenue coming along with current capex. The other half of revenue (aero revenue) is an entitlement approved by the regulator, providing a pre-determined, fixed return over the asset base and a pass-through of costs.

Aero revenue is also expected to get a bump up during fiscals 2022-24, when a new tariff order for airports is likely. Overall aggregate cash flows are likely to double by fiscal 2024 and provide a healthy cushion against servicing of debt contracted for capex, the report concludes.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
Agencies
August 8,2020

Idukki, Aug 8: Nine more bodies have been recovered from the landslide ravaged Pettimudi near Munnar in Idukki on Saturday. With this the death toll in the tragedy reached 26. Around 40 are feared to be still trapped under the debris or washed away.

The rescue operation by NDRF and Fire and Rescue Services that was stopped by Friday evening due to poor light and bad weather resumed by Saturday morning.

Horrifying scene prevailed in the area as relatives of the missing people screamed around in search of their beloved ones. As it is nearly 48 hours since the incident happened, the chances of recovering missing persons alive from the debris is becoming bleak. Three of the bodies recovered on Saturday could not be identified till evening.

Kerala Revenue Minster E Chandrasekharan, who visited the area on Saturday, said that search operation would be carried out until all the missing are recovered.

It was by around 11.30 pm on Thursday that landslide had hit the Nayamakkad estate of Kannan Devan Hills and Plantations. Settlement clusters of plantation workers where 83 persons were staying were reduced to debris as the huge rocks came bulldozing. Five of the residents were reported to be not in the spot while the mishap occured.

Meanwhile, heavy rains led to floods at many parts of the state. Red alert has been issued at Idukki, Malappuram and Wayanad districts for Sunday also. A total of 11,446 persons of 3,530 families were shifted to relief camps across the state, of which major chunk is at Wayanad.

Chief Minister Pinarayi Vijayan said that water level at most dams is increasing swiftly.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
January 17,2020

Jan 17: India's "high power" communication satellite GSAT-30 was successfully launched in the early hours of January 17, the Indian Space Research Organisation (ISRO) said.

The satellite, aimed at providing high-quality television, telecommunications and broadcasting services, was launched onboard Ariane 5 rocket from French Guiana.

Blasting off from the Ariane Launch Complex in Kourou, a French territory located in northeastern coast of South America at 2.35 am IST, European space consortium Arianespace's Ariane 5 vehicle injected GSAT-30 into the orbit in a flawless flight lasting about 38 minutes.

Arianespace CEO Stéphane Israël tweeted about the successful launch of GSAT-30.

ISRO's U R Rao Satellite Centre Director P Kunhikrishnan, who was present in Kourou, congratulated the ISRO community and Arianespace team on the successful launch.

Calling it an "excellent start" to 2020 for ISRO with the launch, he said, "The mission team at the master control facility have already acquired the satellite and they will immediately complete the post launch operations...."

The 3,357-kg satellite, which was deployed from the lower passenger position of Ariane-5 launch vehicle (VA 251) into to geostationary transfer orbit (GTO), is configured on ISRO's enhanced I-3K Bus structure to provide communication services from Geostationary orbit in C and Ku bands.

The satellite derives its heritage from ISRO's earlier INSAT/GSAT satellite series, and is equipped with 12 C and 12 Ku band transponders.

GSAT-30 is to serve as replacement to the "aging" INSAT-4A spacecraft services with enhanced coverage, ISRO has said, adding the satellite provides Indian mainland and islands coverage in Ku-band and extended coverage in C-band covering Gulf countries, a large number of Asian countries and Australia.

With a mission life of 15 years, GSAT-30 is an operational communication satellite for DTH, television uplink and VSAT services.

The Bengaluru-headquartered ISRO has said the communication payload of GSAT-30 is specifically designed and optimised to maximise the number of transponders on the spacecraft bus.

According to the space agency, the spacecraft would be extensively used for supporting VSAT (Very Small Aperture Terminal) network, television uplinking and teleport services, digital satellite news gathering (DSNG), DTH television services, cellular backhaul connectivity and many such applications.

One Ku-band beacon downlink signal is transmitted for ground-tracking purpose, it added.

For its initial flight of 2020, Arianespace on its website said, it would orbit EUTELSAT KONNECT, a telecommunication satellite for the operator Eutelsat, along with GSAT-30, using an Ariane 5 launch vehicle from the Guiana Space Centre.

EUTELSAT KONNECT – which was produced by Thales Alenia Space for Eutelsat – was riding in the upper position of Ariane 5's payload arrangement, and was released first in the flight sequence at 27 minutes following liftoff.

Since the launch of India's APPLE experimental satellite on Ariane Flight L03 in 1981, Arianespace has orbited 24 satellites, including GSAT-30, for the Indian space agency.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.