Dubai to invest $32-billion to build world's largest airport

November 30, 2014

Mumbai, Nov 30: To further secure its position as the world's aviation hub, Dubai Airports is building a whopping USD 32—billion greenfield airport at the upcoming Dubai World Central, 30 km off the present international airport which already is the second busiest in the world.dubai airport

The proposed new airport will become the world's largest aviation facility on completion and will have five runways which all will be simultaneously operational, all A380-compatible with a length of 4.5 km each.

“We are planning a USD 32—billion brand new airport at the Dubai World Central at Al Maktoum, 30 km off the present Dubai facility. In the first phase, the new airport will be able to handle 120 million passengers, which will go up to 200 million by 2020, when the project is completed,” Dubai Airports Corporate Communications Head Julius Baumann told media persons.

“On completion, the new airport will be the world's largest airport, with each concourse the size of seven football fields and have five runways which all will be simultaneously operational, all A380-compatible,” Mr. Baumann said.

The other features include 200 aircraft stands for wide bodied aircraft, four concourses connected via six airport trains to two terminals, which in turn will be linked to the city's metro network. When complete, the mega-hub will have total annual capacity exceeding 200 million passengers and 12 million tonne of freight.

The existing Al Maktoum International opened its doors to passengers on October 27, 2013 and three airlines are operating from here. It has one A380 capable runway, 64 remote stands, one cargo terminal with annual capacity for 250,000 tonne and a fully operational passenger terminal building designed to accommodate 5 million passengers annually.

The Dubai International Airport is the world's second busiest airport after the London Heathrow and is on course to become the global aviation hub, thanks to its geographical location and the availability of cheap fuel.

The first phase of the new airport includes a single A380 compatible runway, a passenger terminal with capacity of 5 million passengers which is expandable to 7 million; a cargo terminal with a capacity of 250,000 tonne per annum and expandable to 600,000 tonne and a 92-metre air traffic control tower.

The state-owned Dubai Airports already operates the Dubai International Airport in the heart of the Arabian megapolis and the Al Maktoum International Airport at the upcoming Dubai World Central (DWC).

The DWC is a 140 sq km new international city being built to de-congest the present city, Dubai Airports' Marketing & Corporate Communications Manager Zaigham Ali said, adding the work on new airport will begin early next year.

Apart from the new airport plan, the Emirate is also expanding the Dubai International Airport with a USD 7.8 billion investment to take the capacity to 100 million by 2020. This project was started in 2011 and will be completed by 2016.

The expansion of the Dubai International include a new concourse (Concourse D), expansion of Terminal 2 to twice its current capacity, refurbishment of Terminal 1, and additional aircraft stands, taxiways and aprons among others.

Dubai International, Mr. Baumann said handled 66.43 million passengers in 2013, and has being growing 15.5 per cent per annum since its launch in 1960. In 2013, it was named the second busiest airport in the world after the London Heathrow.

Mr. Ali said India is the largest source market for the airport, with an airline network that connects Dubai with 18 cities in the country.

In 2013, the airport saw a 14.3 percent increase in passenger numbers from India at 8.5 million and in the first 9 months of this year, the number has already crossed 7 million.

Mr. Ali added the company is confident of crossing the last year's mark this year.

Explaining the rationale for a gigantic new airport, Mr. Baumann said the airport's forecast figures for unconstrained passenger traffic show 126 million passengers by 2020, and 300 million passengers by 2050.

Additionally, the Terminal 2 will double in capacity by 2015. Concourse D of the airport, slated to open by mid 2015, will provide for 100 more aircraft and taking the figure up to 80 million passengers.

In all, the expansion projects will take the airport's passenger capacity to a little over 100 million passengers, Mr. Ali said.

With a built-up area of 1,972,474 sqm, the Dubai International Airport comprises three terminals and ranks among the world's top two busiest airports for international passengers, serving over 125 airlines flying to over 260 destinations, as per the Airports Council International.

On the economic impact of the aviation sector in Baumann, quoting an Oxford Economics report said, aviation will contribute USD 53.1 billion to Dubai's economy, which is 37.5 per cent to its GDP and will support over 750,000 jobs by the turn of 2020.

The aviation sector as a whole contributed USD 26.7 billion to the Dubai economy in 2013, which was almost 27 per cent of the national GDP and supported 416,500 jobs accounting for 21 per cent of the Emirates' total employment.

Passenger traffic in September totalled 5,942,628 compared to 5,407,326 recorded in the same month last year, an increase of 9.9 per cent. January—September rose 6.2 per cent to 52,422,547, up from 49,379,165, while in 2013, the passenger traffic stood 66,431,533, up 15.2 per cent from 2012.

Comments

Herman
 - 
Wednesday, 6 Apr 2016

Hello just wanted to give you a quick heads up.

The text in your post seem to be running off the screen in Opera.

I'm not sure if this is a format issue or something to do with browser compatibility but I
figured I'd post to let you know. The style and design look
great though! Hope you get the problem fixed soon.
Thanks

Also visit my web-site casio or yamaha keyboard: http://www.Aspenaftercare.com/?option=com_k2&view=itemlist&task=user&id…

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
January 8,2020

Bengaluru, Jan 8: The second instalment of flood relief funds from the Centre, announced on Monday, has left BS Yediyurappa less than cheerful, with the chief minister insisting that it is barely adequate. The CM on Tuesday said he will urge the Union government to release more.

On Monday, the Centre announced it will release Rs 669.8 crore in addition to the Rs 1,200 crore it had released earlier towards flood relief and rehabilitation. The total sum is a small fraction of the loss, which the government pegged at a staggering Rs 38,000 crore.

“The Centre has released assistance in two instalments so far, but it is inadequate given the magnitude of the damage. I will request for more funds and I am confident the Centre will oblige,” Yediyurappa told reporters.

When Prime Minister Narendra Modi had visited the state last week, Yediyurappa had urged him — even openly at a function — to release funds. This followed several pleas over the past four months, which barely drew a response from the Centre. Now, the CM himself suggests it’s barely a drop in the ocean.

The opposition has been criticizing both Yediyurappa and the Centre for their handling of the situation and on Tuesday, leader of the opposition Siddaramaiah of the Congress criticised the CM for “misguiding people” on the sum released by the Centre.

Siddaramaiah tweeted, “Reports from State govt officials say only Rs 669 cr of addl funds are released in 2nd instalment as opposed to the claim of Rs 1,870 cr by Karnataka BJP leaders. At a time when manufacturing industries are closing, BJP’s fake news factory is running at full potential ".

In another tweet, he said, “Moved by the plea of chief minister, Yediyurappa, Prime Minister Narendra Modi released an additional Rs 669.8 crore, taking the total amount to Rs 1,869.8 crore. BJP leaders, who are devotees of the god of lies, attempts to depict the total relief amount as 1200+1869.85 = Rs 3,069 cr is ridiculous.”

A high-level committee chaired by Union home minister Amit Shah had sanctioned the National Disaster Response Fund (NDRF) funds on Monday. While the Press Information Bureau claimed Rs 1,869 crore was approved on Monday, state government officials clarified that the figure included the Rs 1,200 crore released in October.

Meanwhile, sources say the two instalments is all the assistance the state can expect from the Centre towards flood relief. Sources say the Rs 1,870 crore is roughly 60% of the funding — Rs 3,000 cr— which was supposed to be allocated for Karnataka, based on an inter-ministerial team’s assessment of losses in the state.

“Compared to other states for the same period, Karnataka has received the highest amount in flood relief. We cannot expect more,” said a revenue department official, who said the government will not approach the Centre for a special package.

However, revenue minister R Ashoka said the state will pitch for the entire Rs 3,000 crore. “The state government will pursue the matter with the Centre until it releases the entire Rs 3,000 crore. The state government will cover the remainder of the Rs 38,000 crore loss. We will not go back on our word,” Ashoka said. Incidentally, the state has spent about Rs 6,000 crore on relief and rehabilitation so far.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
July 22,2020

Bengaluru, Jul 22: Yellow alert has been issued for Karnataka's Shivamogga, Chikmagalur, Hassan, and Kodagu for July 23 and 24.

Some areas of Bengaluru may receive light rainfall today, said CS Patil, Director, IMD Centre, Bengaluru.

He added that coastal areas of the state are very likely to experience rainfall from on July 23 and July 24, and that rainfall may increase July 24 onwards. Widespread rainfall is predicted for July 24th, 25th, and 26th.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
February 13,2020

Bengaluru, Feb 13: Veteran freedom fighter and advisor to the Karnataka Government in Education Reforms HS Doreswamy on Thursday has recommended Chief Minister BS Yediyurappa to make it mandatory for MLA and MLCs to adopt at least three govt Schools in their respective constituencies.

Mr Doreswamy appealed to the Chief Minister to implement the suggestion in the State budget for 2020-21 to be presented by him on March 5.

Addressing a press conference here, Mr Doreswamy, on the higher education sector, stressed the need to appoint highly qualified candidates for Vice Chancellor posts. There is no dearth of talent and eligibility in the State and authorities concerned must ensure that the right person is appointed by taking extreme care".

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.