Transit One: Well begun is half done

[email protected] (Business Desk )
May 19, 2016

Every summer they say has its own story. The arrival of the summer sun brings in glad tidings with it at Transit One, which has crossed an important project milestone with the completion of the foundation stage of civil works.

transitone 1

True to their founding values, Team Ecologic Habitats takes immense pride in delivering quality work as per the committed timeframe.

“Despite various challenges in the process, we have systematically overcome each one of them using best technical expertise in the field.

A portion of the foundation works have been carried out by driving in piles for the retaining walls using the most updated technology.

Sub-soil drainage systems and effective permanent De-watering systems have been executed to ensure smooth functioning of services in the building.

Methodical Implementation of works with prior planning , testing of building materials to meet required quality & safety standards remain to be our hallmark.” Says one of the project directors.

The overwhelming public response to the innovative Transit concept has resulted in the entire level 3 boutique stores being sold out..!

Valuable Market feedback from customers & well wishers has lead them to carve out two dedicated theme zones at Level 2.

Mangalore's hip Womenfolk & Geeky gadget freaks will now have a dedicated theme bazaars to explore the latest trends in Women's fashion & Technology.

The Transit vision now sits on a firm footing for a smooth takeoff.

The project team is targeting the completion of the level 2 slab before the arrival of the Monsoon.

Ecologic Habitats is now offering attractive seasonal discounts and rental assurance on select products.

Stores starting at Rs 12 lakhs are up for grabs until May 31st.

Avail best offers and customised solutions to all your real-estate requirements at the earliest by getting connected with Ecologic Habitats on the address below.

“Build to-day, then, strong and sure,
With a firm and ample base;
And ascending and secure
Shall to-morrow find its place.”
-HW Longfellow

For more details on Progress of work do visit www.ecologichabitats.com or write to us at [email protected]

transitone 4>

transitone 2

transitone 3

transitone 5

transitone 6

transitone 7

transitone 8

Comments

Farooq
 - 
Friday, 20 May 2016

really wonderful contracting.

Mohammed Sameer
 - 
Friday, 20 May 2016

Really happily to c the contraction work, this builder s very professional that each and every development of the site he s showing through the beautiful article, i must say worldclass planning.

Zakir Hussain
 - 
Friday, 20 May 2016

will be coming to mangalore next month, planning to buy one shop here, looks wonderful job did by the builder.

Prabhu
 - 
Friday, 20 May 2016

Wow look at the contraction work, i dont have money otherwise i would have owned one shop here for sure,

Priya Shenoy
 - 
Friday, 20 May 2016

wow nicely contracted building, world class finishing, with closed eyes people can buy the shop here, last long quality,

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
February 17,2020

Varanasi, Feb 17: For the first time, the Indian Railways has reserved a seat for a deity on a train. The national transporter, which launched its third IRCTC operated train named Kashi Mahakal Express from Varanasi to Indore, has reserved a seat for Lord Mahakal (Lord Shiva) on board.

Speaking to media, Northern Railway spokesperson Deepak Kumar said: "It is for the first time that a seat has been left reserved for a deity."

"One seat in Kashi Mahakal Express (seat number 64 in B5 coach) has been left reserved for Lord Shiva," he said.

"Even a temple has been drawn on the seat to make people aware that the seat is reserved for Lord Mahakal," he said.

IRCTC's Director, Tourism, Rajni Hasija said that the practice would continue beyond the inaugural run.

Prime Minister Narendra Modi flagged off the Kashi Mahakal Express via video conferencing from Varanasi, where he is all launched several projects worth Rs 1,250 crore during the day's visit to his parliamentary constituency.

The third IRCTC train, after the two Tejas Express trains on New Delhi-Lucknow and Mumbai-Ahmedabad routes, the Kashi Mahakal Express will connect three places -- Jyotirlinga-Omkareshwar (near Indore), Mahakaleshwar (Ujjain) and Kashi Vishwanath (at Varanasi).

Also connecting the industrial and educational hub of Indore, with Bhopal, the train will begin its commercial run from February 20.

"The Kashi Mahakal Express will operate three days in a week and it will be a bi-weekly service through the Sultanpur-Lucknow route and a weekly service via the Prayagraj route," Kumar said.

Elaborating on the two routes from which the train will pass every week, Hasija said: "Once the new train starts its regular run from this week, it will depart from Varanasi at 2.45 p.m. every Tuesday and Thursday to reach Indore at 9.40 a.m. on Wednesday and Friday.

Similarly, the train will start from Indore at 10.55 a.m. every Wednesday and Friday and will reach Varanasi at 6.00 a.m. the next day. This train will have stoppages at Ujjain, Sant Hirdaram Nagar, Bina, Jhansi, Kanpur and Sultanpur stations in both directions.

Meanwhile, in the weekly service via Prayagraj route, the Kashi Mahakal Express will depart from Varanasi at 3.15 p.m. every Sunday to reach Indore at 9.40 a.m. the next day. On the other way, it will depart from Indore at 10.55 a.m. every Monday and reach Varanasi at 5 a.m. the next day.

"This train will halt at Ujjain, Sant Hirdaram Nagar, Bina, Jhansi, Kanpur and Allahabad stations in both directions," Kumar said.

Explaining the fares of the Kashi Mahakal Express, Hasija said, "Kashi Mahakal Express will follow a dynamic fare structure like the other two Tejas Express trains."

One-way journey from Varnasi to Indore will cost Rs 1,951, inclusive of four meals.

According to the IRCTC officials, the Indore-Varanasi Kashi Mahakal Express will be the first private train that will run overnight and for a comfortable long distance journey, will feature a host of facilities. The IRCTC will serve vegetarian food, and provide housekeeping services, on-board security services and bedrolls.

The IRCTC officials said that passengers will also get complementary insurance of Rs 10 lakh.

The train will have an advance reservation period of 120 days and will only have the general and foreign tourist quotas. The current booking will be available to the passengers on the platform itself after preparation of first chart, four hours to five minutes before the scheduled departure of the train.

To facilitate travel for pilgrims, the IRCTC is also introducing special tour packages for passengers who want to see the pilgrim centres enroute. The tour options are; Mahakal Darshan (Ujjain - Omkareshwar), Bhopal-Sanchi-Bhimbetka, Malwa Jyotrilinga Darshan (Ujjain-Omkareshwar- Maheshwar- Indore) and Bhopal-Sanchi-Bhimbetka-Ujjain. Other tour options include Kashi, Ayodhya and Prayag; Kashi Darshan; Kashi, Prayag, Ayodhya; Kashi and Prayag and only Kashi.

The train has silent features like CCTV cameras, which will be monitored online around the clock from the IRCTC centres, whereas for the first time the IRCTC has brought the marshals in the train for passengers safety and also to make people aware to not smoke inside the train as it has smoke and heat sensors installed in the coaches as well as in the bathroom. For the blind passengers, the train coaches have the seat numbers written in Braille, and the catering staff will be dressed in yellow kurta-pyjamas with a rudraksh malas on their necks to promote the train's theme.

Comments

ASIF
 - 
Tuesday, 18 Feb 2020

waw.. good header with superb news..

good going !!

Althaf
 - 
Tuesday, 18 Feb 2020

If you are truthful then go to china and stay with patients of carona virus. The carona virus should not affect you as you are a vegeterian. Prove this first. 

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
July 10,2020

Bengaluru, Jul 10: Accredited Social Health Activist (ASHA) workers under the All India Trade Union Congress (AITUC) on Friday held protests in different parts of Karnataka, demanding personal protective equipment (PPE) kits and a salary of at least Rs 12,000 per month.

According to Madhu Kumari, an ASHA worker from Kalaburgi, ASHA workers currently receive a salary of Rs 3,000 per month.

"Our demand is to increase our wages to at least Rs 12,000 per month. We have been making this demand for the last six months but we have not received any response from the authorities. We will not go back to work until we are given an appropriate response. We did not want to create a difficult situation but the government has given us no choice," Kumari told ANI.

Clad in their signature pink saris, the women were holding posters in their hands and raising slogans to demand appropriate salary for their work and the necessary equipment to protect themselves from the ongoing COVID-19 pandemic.

Farhana, an ASHA worker protesting in Shivamogga, said that the women have been making demands for PPE kits since June 30. "We have been taking care of COVID patients for the last few weeks but have not received adequate PPE kits. A few of us received some in the beginning but they were not enough. We are not even given hand sanitiser or masks to protect ourselves," she added.

"We have sent letters to the District Commissioner's Office and to the Ministry of Health and Family Welfare but our pleas have gone unheard. We are protesting to get the attention of the concerned authorities," she added.

They also demanded that authorities to conduct their COVID-19 tests as they have to deal with patients infected with the virus.

Sajida, an ASHA worker in Kalaburagi said, "We are very stressed about the COVID situation. We take care of sick people day in and day out, but no one is there to take care of us. We want the government to conduct COVID tests for all ASHA workers in the state."

Comments

Angry bakth
 - 
Sunday, 12 Jul 2020

ASHA worker its better to sleep in home instead of working and risking your life, 3000 rupes is nothing...who can work home....government of indian is one of the namarad and currupt, you wont get any hike...

 

poor people will survive this COVID but not the rich currupt politician, let them die like dog

 

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
January 1,2020

Mangaluru, Jan 1: Led by two local MLAs belonging to Bharatiya Janata Party, dozens of people today forcibly stopped toll fee collection at Talapady toll gate on the outskirts of the city allowing vehicles plying between Karnataka and Kerala on the national highway 66 to travel without paying any fee for some time.

Mangaluru City South MLA D Vedavyasa Kamath and Mangaluru City North MLA Y Bharat Shetty, who led the workers, said that the Navayuga Udupi Tollway Pvt. Ltd. (NUTPL), the concessionaire of the about 90-km-long highway widening project between Talapady and Kundapura in Karnataka, had failed to complete the project since over a decade.

The service roads and two flyovers under the project remained uncompleted. Hence motorists were facing a hardship. Notwithstanding Nalin Kumar Kateel, Dakshina Kannada MP, arranging ₹56 crore loan to the NUTPL through Axis Bank to complete the prominent Pumpwell flyover in the city, the company had failed to complete it.

The MLAs said that they stopped the toll collection as a symbolic protest to bring pressure on the company to complete the project within this month.

The BJP workers who gathered near the toll gate around 7.30 a.m. forcibly removed the barricades and made the vehicles ply without paying the fee. The workers of the company managing the toll booth did not resist.

The BJP workers said that vehicles would ply without paying toll till about 6 p.m. If the company resumed the collection during the day on Wednesday, the party workers would again forcibly stop it on Thursday, they said.

Shivaprasad Rai, in-charge of toll collection of the company at Talapady, Hejmady and Sasthana on the same highway told The Hindu that the NUTPL collected about ₹7 lakh as toll fee daily at Talapady from over 12,000 vehicles. The loss on Wednesday could be about ₹4 lakh.

The project is being implemented under build, operate and transfer basis.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.