Bengaluru, Jan 2: The Congress leadership in Delhi is expected to start the process of selecting a new party chief for Karnataka next week. There are strong indications the race has narrowed to DK Shivakumar and MB Patil.
Party insiders said the leadership almost finalised Shivakumar’s name as the president of Karnataka Pradesh Congress Committee (KPCC), but the decision was put on hold after requests by some senior members.
“It’s not that we are against Shivakumar. We think the party should have a Lingayat at the helm since community strongman and chief minister BS Yediyurappa is at the fag end of his long political career. There’s an opportunity here for a Congressman to occupy that space,” said a senior Congress politician, who didn’t want to be named.
That’s where the candidacy of Patil, a Lingayat, scores high.
The party, however, doesn’t want to compromise on quality and wants an efficient KPCC president who can unite two rival factions within the party, one led by Siddaramaiah and another by former union minister KH Muniyappa.
The need to pick a new state president arose after Dinesh Gundurao resigned from the post last month, taking moral responsibility for Congress’s poor showing in the byelections. Siddaramaiah also stood down as Congress party legislature leader.
The insiders said the new KPCC chief could be announced after January 16. The party might also appoint two working presidents and a new legislature party leader, who will automatically become the opposition’s voice in the assembly.
For the latter position, the name of senior Dalit politician and former deputy chief minister G Parameshwara is doing the rounds. But the party, the sources said, could still ask Siddaramaiah to reconsider his decision and stay on.
Many Congress members had raised questions over his stewardship after the bypoll disappointment. They said on his watch, the party had also fared badly in the assembly and Lok Sabha elections, demanding that he be held accountable.
Siddaramaiah is expected to visit Delhi next week to discuss the leadership issue with party boss Sonia Gandhi. Some other senior Congress members, including BK Hariprasad, are also likely to meet her.
Comments
anybody got their grevences answered here
corporation lights of cemetrey not glowing since two months. On 1st November 2019 is holy souls day. Kindly repair the lights at the earliest.
Fr. Joseph J. Lobo
Parish Priest
Street light is not working since 15 days. On 23rd July 2019 complaint lodged with Mobile No7353933410. Till date they are not responding
hello / madam
Keeping the city clean is our duty. I know not everybody is following that. We need some awareness program
to keep our city clean green and hygenic. Its our duty to keep the environment clean and place around us.
But it is also the duty of Corporation to maintain the cleanliness aroud the city, in some parts of the city like market, near clock tower circle its not been getting cleaned from past few days. Please do the needfull for betterment of tomorrow
thank you
Dear Madam, I have purchased 1 BHK flat in Green City, Vamadapadav on October, 2013 and paid full amount to builder T3 Urban Developers LTD. As per agreement possession was in December, 2015 but still building is not ready.
There were 5 buildings in Green City and at a time builder started 3 buildings construction work. I have purchased middle of the building and that building 1st floor slab only completed and since long time work stopped.
Last year builder agreed to give me flat in 1st building but building’s interior work is still pending and since 1 year work totally stopped.
Presently builder is not picking call or not responding for query. It seems that he is cheating with me. Kindly help me to resolve this issue. I will be grateful to you.
Sir/Madam,
Four street lights are not working on Raghavendra Matt Road, Hosabettu, Surathkal since long.
The roads are in Shabby condition and hence difficult in the night to Padastrians.
Kindly arrange to replace the treet lights on Main road, Raghavendra Matt Road, Hosabettu, near and after the Areca Field.
the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.
the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all.
both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.
in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.
now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.
Street light not working at kulai kavinakallu 2nd street
Relevant department has to look into the matter seriously and work on it and mark the matter as closed so that its notified as closed. Its a good move for public and public workers to work hand in hand
Add new comment