Bengaluru, Mar 27: Oncologist Dr. Vishal Rao, HCG Hospital Bengaluru on Friday said that human body cells release interferon chemical to kill viruses but it cannot be released by cells in the case of COVID-19 cases, leading to weak immune system. However, a therapy of specific concoction could be useful in treating COVID-19 patients.
"We got hold of some preprint suggesting that interferon is effective in COVID19," said Rao.
Speaking to news agency, he continued saying "When we withdraw blood for regular check-ups, we get buffy coat which can be used to take out cells and form interferon. These two chemicals and some other cytokines, in a specific concoction, could be potentially very useful in treating COVID-19 patients."
Rao said that they have built a concoction of cytokines which can be injected to reactivate immune system in COVID-19 patients.
"We are in a very initial stage and hope to be ready with its first set by this weekend. We have applied to the governement for an expedited review. We have also presented this before the state government" said Rao.
"We have a team of infection specialist, ICU team and other...all of us have worked together to build something that we believe. We want to serve the society at this hour of need," he added.
Dr Rao clarified that this is not a vaccine and this particular interferon therapy does not help to prevent the infection of COVID-19. However, this is focused and targeted towards COVID-19 positive patients or those who have just incubated the virus.
"We believe that in early stages as well as the patients who have just incubated, this particular therapy of interferon gama and other concoction of cytokines could be an effective method. In the late stages we are looking at specific dosage of the cells which are our own body cells which can actually be affective and could also be of use for the ventilator patients," he added.
Meanwhile, Dr Gururaj, Immunologist and Scientist told ANI that they are trying to cover two aspects, one is the early stage patients where they are trying to improve their immune systems.
"As Dr Vishal said, we are trying to see whether we can use the cytokines from our own immune cells which is a natural process but it is hampered in infected patients," said Dr Gururaj.
"In the last phase we are using cells which are used from the bone marrow of the patient or donors. We can use those cells to reduce the inflation and so called cytokines release syndrome which is basically the inflammatory response of the body," he added.
Comments
anybody got their grevences answered here
corporation lights of cemetrey not glowing since two months. On 1st November 2019 is holy souls day. Kindly repair the lights at the earliest.
Fr. Joseph J. Lobo
Parish Priest
Street light is not working since 15 days. On 23rd July 2019 complaint lodged with Mobile No7353933410. Till date they are not responding
hello / madam
Keeping the city clean is our duty. I know not everybody is following that. We need some awareness program
to keep our city clean green and hygenic. Its our duty to keep the environment clean and place around us.
But it is also the duty of Corporation to maintain the cleanliness aroud the city, in some parts of the city like market, near clock tower circle its not been getting cleaned from past few days. Please do the needfull for betterment of tomorrow
thank you
Dear Madam, I have purchased 1 BHK flat in Green City, Vamadapadav on October, 2013 and paid full amount to builder T3 Urban Developers LTD. As per agreement possession was in December, 2015 but still building is not ready.
There were 5 buildings in Green City and at a time builder started 3 buildings construction work. I have purchased middle of the building and that building 1st floor slab only completed and since long time work stopped.
Last year builder agreed to give me flat in 1st building but building’s interior work is still pending and since 1 year work totally stopped.
Presently builder is not picking call or not responding for query. It seems that he is cheating with me. Kindly help me to resolve this issue. I will be grateful to you.
Sir/Madam,
Four street lights are not working on Raghavendra Matt Road, Hosabettu, Surathkal since long.
The roads are in Shabby condition and hence difficult in the night to Padastrians.
Kindly arrange to replace the treet lights on Main road, Raghavendra Matt Road, Hosabettu, near and after the Areca Field.
the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.
the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all.
both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.
in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.
now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.
Street light not working at kulai kavinakallu 2nd street
Relevant department has to look into the matter seriously and work on it and mark the matter as closed so that its notified as closed. Its a good move for public and public workers to work hand in hand
Add new comment