Bengaluru, June 27: In the wake of mounting covid-19 cases across Karnataka, the state government has decided to extend the night curfew hours and to re-impose Sunday lockdown.
Chief Minister BS Yediyurappa held an emergency meeting on Saturday with the state's top officials to discuss measures to further contain the spread of the novel coronavirus.
During the meeting, it was decided that a state-wide lockdown will be imposed on each Sunday starting July 5. Only essential services and supplies will be allowed on Sundays.
Timings of the night curfew have also been revised to 8 PM - 5 AM from the earlier 9 PM - 5 AM. “We have decided to impose a curfew starting Monday, June 29, from 8 pm to 5 am every day. Right now, the curfew timing is 9 pm to 5 am, but it’ll be advanced by an hour to 8 pm,” said Home Minister Basavaraj Bommai
Commissioner of Bengaluru's civic body, BBMP has been directed to set up more wholesale vegetable markets to deter large crowds.
Meanwhile, government offices in Karnataka will open only five days a week and the weekend will be off for government employees.
It was also decided during the meeting on Saturday that a centralized bed-allocation system for Covid-19 patients will be taken up to ensure that each patient gets a bed without overwhelming the healthcare infrastructure.
Yediyurappa has also instructed officials to increase the number of ambulances for Covid-19 patients to 250 apart from arranging separate vehicles to carry mortal remains of victims. The police control room will aid officials in identifying the location and easing the movement of ambulances.
Information about nodal officers working for COVID management will be published. Joint Commissioners of 8 regions will be given additional responsibilities and KAS officers will be appointed to assist them.
The services of 180 ESI doctors appointed by the Labour Department will also be relied on by the state government. CM Yediyurappa has also asked officials to reserve wedding halls, hostels and other institutions in Bengaluru as COVID Care Centres.
Bengaluru Urban DC, on the other hand, was instructed to identify more places for the last rites of patients and also to form more teams for this purpose.
The BBMP Commissioner has been told to notify reservation of 50 per cent beds in medical colleges and private hospitals.
Comments
anybody got their grevences answered here
corporation lights of cemetrey not glowing since two months. On 1st November 2019 is holy souls day. Kindly repair the lights at the earliest.
Fr. Joseph J. Lobo
Parish Priest
Street light is not working since 15 days. On 23rd July 2019 complaint lodged with Mobile No7353933410. Till date they are not responding
hello / madam
Keeping the city clean is our duty. I know not everybody is following that. We need some awareness program
to keep our city clean green and hygenic. Its our duty to keep the environment clean and place around us.
But it is also the duty of Corporation to maintain the cleanliness aroud the city, in some parts of the city like market, near clock tower circle its not been getting cleaned from past few days. Please do the needfull for betterment of tomorrow
thank you
Dear Madam, I have purchased 1 BHK flat in Green City, Vamadapadav on October, 2013 and paid full amount to builder T3 Urban Developers LTD. As per agreement possession was in December, 2015 but still building is not ready.
There were 5 buildings in Green City and at a time builder started 3 buildings construction work. I have purchased middle of the building and that building 1st floor slab only completed and since long time work stopped.
Last year builder agreed to give me flat in 1st building but building’s interior work is still pending and since 1 year work totally stopped.
Presently builder is not picking call or not responding for query. It seems that he is cheating with me. Kindly help me to resolve this issue. I will be grateful to you.
Sir/Madam,
Four street lights are not working on Raghavendra Matt Road, Hosabettu, Surathkal since long.
The roads are in Shabby condition and hence difficult in the night to Padastrians.
Kindly arrange to replace the treet lights on Main road, Raghavendra Matt Road, Hosabettu, near and after the Areca Field.
the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.
the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all.
both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.
in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.
now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.
Street light not working at kulai kavinakallu 2nd street
Relevant department has to look into the matter seriously and work on it and mark the matter as closed so that its notified as closed. Its a good move for public and public workers to work hand in hand
Add new comment