Bengaluru, Jun 24: Dr K Sudhakar on Wednesday held a video conference with senior officials to review the preparedness for conducting of SSLC examinations safely which is beginning from Thursday.
"8,48,203 students will appear for the SSLC examination starting tomorrow in 2,879 centres across the state. All the guidelines issues by state government must be followed strictly" Sudhakar said in the meeting.
"It is the collective responsibility of officials of all departments to ensure that every student is safe, from the time he or she leaves home for the exam centre and returns home after the exams. The vehicles used to ferry students, where public transport is not available, must be sanitised properly. The surroundings near exam centres, exam halls, toilets must be sanitised properly. Social distancing must be maintained in the exam hall and mask must be provided to all students," he said.
The minister also said that since the students have been asked to arrive at exam centre at 7:30 in the morning, a small biscuit packet must be provided to each student so that they don't feel hungry during the exam and till they return home after the exam.
"Thermal scanning of every student should be done before allowing inside the exam hall. In case there is fever those students must be made to write exam in separate room. Separate exam halls must be arranged for students in quarantine areas and if it's not feasible they must be allowed to write exam in September. District administrations must disseminate information about precautionary measures taken to build confidence among parents," the minister said.
Sudhakar instructed the officials to work in coordination with the Education Department and other departments.
Stating that there are 458 containment zones in Bengaluru, the minister asked the officials to be extra cautious in these areas and make arrangements to ensure health department staff can take students to the nearest health center if anybody is found ill during the exam.
Education Minister Suresh Kumar, Additional Chief Secretary Javed Akhtar, Education Secretary, Secretary of Medical Education Department, BBMP officials, Health Experts and others were present.
Comments
anybody got their grevences answered here
corporation lights of cemetrey not glowing since two months. On 1st November 2019 is holy souls day. Kindly repair the lights at the earliest.
Fr. Joseph J. Lobo
Parish Priest
Street light is not working since 15 days. On 23rd July 2019 complaint lodged with Mobile No7353933410. Till date they are not responding
hello / madam
Keeping the city clean is our duty. I know not everybody is following that. We need some awareness program
to keep our city clean green and hygenic. Its our duty to keep the environment clean and place around us.
But it is also the duty of Corporation to maintain the cleanliness aroud the city, in some parts of the city like market, near clock tower circle its not been getting cleaned from past few days. Please do the needfull for betterment of tomorrow
thank you
Dear Madam, I have purchased 1 BHK flat in Green City, Vamadapadav on October, 2013 and paid full amount to builder T3 Urban Developers LTD. As per agreement possession was in December, 2015 but still building is not ready.
There were 5 buildings in Green City and at a time builder started 3 buildings construction work. I have purchased middle of the building and that building 1st floor slab only completed and since long time work stopped.
Last year builder agreed to give me flat in 1st building but building’s interior work is still pending and since 1 year work totally stopped.
Presently builder is not picking call or not responding for query. It seems that he is cheating with me. Kindly help me to resolve this issue. I will be grateful to you.
Sir/Madam,
Four street lights are not working on Raghavendra Matt Road, Hosabettu, Surathkal since long.
The roads are in Shabby condition and hence difficult in the night to Padastrians.
Kindly arrange to replace the treet lights on Main road, Raghavendra Matt Road, Hosabettu, near and after the Areca Field.
the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.
the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all.
both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.
in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.
now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.
Street light not working at kulai kavinakallu 2nd street
Relevant department has to look into the matter seriously and work on it and mark the matter as closed so that its notified as closed. Its a good move for public and public workers to work hand in hand
Add new comment