New Netravati dam will be ready in 2 years; land losers will get compensation: Minister

coastaldigest.com web desk
September 14, 2018

Mangaluru, Sept 14: The construction of the proposed barrage dam across River Netravati between Arekala and Adyar, about 5kms downstream Thumbe vented dam, can be completed within two years after the completion of tender process, according to minister for minor irrigation C S Puttaraju.

Puttaraju, who along with minister for urban development and housing U T Khader inspect the proposed dam construction site, told media persons that those who will lose their lands due to the dam will be provided suitable compensation.

Mr Khader said that the dam will be constructed under the Pashchima Vahini scheme at an estimated cost of Rs 174 crore. It will be a barrage cum road project, he said, adding that a 7 meter wide road will also be constructed atop the dam.

The dam is expected to meet the drinking water requirement of people of Ullal and surrounding areas in Mangaluru City constituency represented by Mr Khader.

A survey has already been conducted for the new dam and a rough estimate is ready. A detailed project report will be prepared and the process of floating tenders will begin after the proposal gets the cabinet approval. Later, the supply network and other related works will be planned based on the requirement, he said.

The two ministers also convened a meeting involving people's representatives from the coastal districts on the implementation of Paschimavahini Scheme at deputy commissioner's office.

Comments

Ibrahim
 - 
Friday, 14 Sep 2018

UTK should think and consider impacts on nature also. Kodagu, Kerala faced deluge and landslides due to improper developments

Nature Lover
 - 
Friday, 14 Sep 2018

You people are ready to give compensation to people. What about animals, birds and insects. Those are inevitable to earth. It is inevitable for keeping natural equillibrium. Dont show developments by destroying nature

Sandesh
 - 
Friday, 14 Sep 2018

Totally nature destroying decision. Should study the area properly. Dam causes serious impacts on nature.

Danish
 - 
Friday, 14 Sep 2018

New dam is unnecessary thing. It destroys habitat. It cause natural imbalance. In future kodagu flood like calamity will occur in mangaluru

UTK fan
 - 
Friday, 14 Sep 2018

Khader bai restarted services. All the best. Take care of your health

Danish
 - 
Friday, 14 Sep 2018

Dams are temples of modern India
-  Jawaharlal Nehru

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
coastaldigest.com news network
June 12,2020

Mangaluru, Jun 12: A huge crowd gathered for the grand opening of the newly built 175-metre-long two-lane bridge across Phalguni River on National Highway 169 near Gurupura on the outskirts of the city today.

Even as the photos of the bridge inauguration ceremony went viral on social media, netizens took the elected representatives and the district administration to task for flouting safety norms at a time when the coronavirus cases are continuing to mount in coastal Karnataka.

The bridge was completed in a record time of 15 months. Dakshina Kannada MP and State BJP President Nalin Kumar Kateel and district in-charge Minister Kota Srinivas Poojari inaugurated the bridge in the presence of Mangaluru City North MLA Y. Bharath Shetty and others.

The bridge has come as a breather to thousands of travellers between Mangaluru-Moodbidri-Karkala on the busy NH. The age-old steel bridge had become dilapidated and was a cause for concern for road users. The highway is also under the process of getting widened to four lanes.

The bridge was constructed at an estimated cost of Rs 30 crore by contractor Sudhakar Shetty of Mugrodi Construction. Work started in February last and the contractor had time till February next.

While the two-lane carriageway is 16 metres wide, the bridge has 2.5-metre-wide pedestrian paths on both the sides. New approach roads of 500 metres each were also part of the project.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
coastaldigest.com web desk
June 27,2020

New Delhi, June 27: The Prime Minister Narendra Modi-led union government of India is not ready to stop all imports from aggressive China in spite of mount calls to boycott Chinese products in India.

The Centre is reportedly considering to stop only non-essential imports from the neighbouring country.

However, the Inward shipment in sectors such as automobiles, pharmaceuticals, certain electronics and others will continue until a domestic alternative is found.

“India will gradually move towards import substitution. It will not happen overnight. In the meantime, attention has to be paid on production and job creation. We cannot throttle our industry. There are certain absolutely essential imports. Needless to say, those will keep going,” official sources said.

Sources said that both the government and the industry are in the process of identifying products that can be domestically manufactured in the medium term. There are certain chemicals, automotive components, handicrafts, cosmetics, agriculture items and certain consumer electronics, which can be manufactured domestically in the short to medium term. The government is doing all it can to raise the capacity of domestic industries.

However, there are certain other imports in the automobile and the pharmaceutical sectors which cannot be done away within the short to medium term. Their domestic production at the moment may not be that cost-effective.

The six-crore strong traders’ body CAIT has been at the forefront of such a demand and has launched a campaign to celebrate Indian Diwali this year with a total absence of Chinese goods.

“Ease of doing business, capital availability at lower rates and globally competitive logistics and energy costs are some of the prerequisites that the government should look into to ensure the growth of the domestic auto component industry,” according to Automotive Component Manufacturers Association of India (ACMA) Director General Vinnie Mehta.

Maruti Suzuki Chairman R C Bhargava said, “People who are boycotting Chinese goods have to remember that in some cases it may lead to their being asked to pay more for the same product."

Meanwhile, domestic rating agency Acuite Ratings & Research has analysed the current import portfolio from China and found 40 sub-sectors have the potential to lower their import dependency on China. These sectors contribute to $33.6 billion worth of imports from China and about 25% of these imports can be substituted by local manufacturing without any significant additional investments.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
February 4,2020

Mangalore, Feb 4: Final chance to present evidence and record eyewitness statements with the Deputy Commissioner of Udupi G Jagadeesh regarding the December 19 violence will be held on February 6 between 1100 and 1300 hrs.

Eyewitness and evidence presenters can depose at the Assistant’s Commissioner’s Court Hall in the Mini Vidhan Soudha in the city.

The Deputy Commissioner said that no evidence would be accepted after this last round of public hearing.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.