Bengaluru, Jun 7: Suspense over JD(S) patriarch HD Deve Gowda contesting the Rajya Sabha polls from Karnataka with Congress' support continues as KPCC president D K Shivakumar on Saturday said the party has fielded one candidate and the high command will decide on what do with surplus votes.
Mr Shivakumar also said his official takeover as party state unit president is likely to take place on June 14.
"Whatever our national leadership will decide... For now we are fielding only one candidate, regarding surplus votes whatever our high command says, we will abide by it," he said in response to a question about supporting Deve Gowda.
Polls for four Rajya Sabha seats from Karnataka is scheduled for June 19.
The Congress, which can win one seat with its strength in the assembly, has fielded veteran party leader Mallikarjun Kharge as the candidate, while the BJP is yet to decide on candidates for two seats it can win.
The JD(S), which has 34 seats in the assembly, is not in a position to win a seat in Rajya Sabha on its own, and will need support from one of the national parties with their surplus votes for this.
Minimum 44 votes are required for candidates to win.
Speculation is rife that congress is likely to support JD(S) with its surplus votes if the regional party fields Mr Gowda, and in return may seek favour during legislative council polls slated later this month.
Though JD(S) legislators are of the unanimous opinion that Mr Gowda should contest Rajya Sabha polls, the 87-year-old leader is said to be undecided and weighing options.
If he contests and wins, this will be the second Rajya Sabha entry for him, the first time being in 1996 as Prime Minister.
June 9 is the last date for filing nominations.
Stating that on June 8, Mallikarjun Kharge will file his nomination for Rajya Sabha polls, DK Shivakumar requested party workers not to come to Congress office or Vidhana Soudha, where the nomination will be filed, because of the COVID-19 pandemic.
"Let your love and affection continue, but let's not create problems by gathering here. After the election is over, and once he (Kharge) wins, you can greet and congratulate him. Let's not bring a bad name to his seniority for not maintaining social distancing by gathering," he said.
Comments
anybody got their grevences answered here
corporation lights of cemetrey not glowing since two months. On 1st November 2019 is holy souls day. Kindly repair the lights at the earliest.
Fr. Joseph J. Lobo
Parish Priest
Street light is not working since 15 days. On 23rd July 2019 complaint lodged with Mobile No7353933410. Till date they are not responding
hello / madam
Keeping the city clean is our duty. I know not everybody is following that. We need some awareness program
to keep our city clean green and hygenic. Its our duty to keep the environment clean and place around us.
But it is also the duty of Corporation to maintain the cleanliness aroud the city, in some parts of the city like market, near clock tower circle its not been getting cleaned from past few days. Please do the needfull for betterment of tomorrow
thank you
Dear Madam, I have purchased 1 BHK flat in Green City, Vamadapadav on October, 2013 and paid full amount to builder T3 Urban Developers LTD. As per agreement possession was in December, 2015 but still building is not ready.
There were 5 buildings in Green City and at a time builder started 3 buildings construction work. I have purchased middle of the building and that building 1st floor slab only completed and since long time work stopped.
Last year builder agreed to give me flat in 1st building but building’s interior work is still pending and since 1 year work totally stopped.
Presently builder is not picking call or not responding for query. It seems that he is cheating with me. Kindly help me to resolve this issue. I will be grateful to you.
Sir/Madam,
Four street lights are not working on Raghavendra Matt Road, Hosabettu, Surathkal since long.
The roads are in Shabby condition and hence difficult in the night to Padastrians.
Kindly arrange to replace the treet lights on Main road, Raghavendra Matt Road, Hosabettu, near and after the Areca Field.
the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.
the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all.
both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.
in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.
now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.
Street light not working at kulai kavinakallu 2nd street
Relevant department has to look into the matter seriously and work on it and mark the matter as closed so that its notified as closed. Its a good move for public and public workers to work hand in hand
Add new comment