New Delhi, Jun 8: Two civil defence employees have been arrested by the Rajasthan Police today in Jaipur based on Military Intelligence (MI) inputs that they had been passing on sensitive information to Pakistan's spy agency ISI.
The arrested are: Vikas Kumar (29), a civil defence employee at an army ammunition depot near Shri Ganganagar (Rajasthan) and Chiman Lal (22), a civil contractual employee of the army's Mahajan Field Firing Range (MFFR), Bikaner.
Both were working as espionage agents on behalf of Pakistan's intelligence agency and were giving out details of Ammunition and MFFR, vital military installations in India's Western front.
The MI Lucknow's operation named Desert Chase assumes great importance as the Shri Ganganagar Ammunition Depot and Bikaner MMFR are strategically important military installations on the western front along the Pakistan border.
The work on the "operation" began in August 2019, when the MI Lucknow, through its sleuths, learnt about an espionage agent near Sri Ganganagar who was passing military information to his handlers in Pakistan. The individual was identified as Vikas Kumar - the civil defence employee at an army ammunition depot near Sri Ganganagar.
The MI Lucknow shared the case with UP ATS in the month of January 2020. Vikas's activities were monitored and analysed by a joint team of MI Lucknow and UP ATS. The operation was code-named 'Desert Chase'.
Based on these, it was learnt that Vikas is acquiring photos of a "water distribution register" at a water point/pump house in MFFR through a contractual civil employee named Chiman Lal. The development of the case was halted due to the start of the lockdown period all across the country.
Finally, the case shared with Rajasthan Police Intelligence in the first week of May 2020. A joint team was formed between Rajasthan Police-Intelligence and MI Lucknow.
Fresh leads were found as new payments were detected along with a trail of sensitive information being passed on to Pakistan by two accused.
Vikas Kumar confessed to having passed the following information to Pakistan:
• Details received from Chiman Lal about Army units and their strength coming to MFFR.
• Details of ammunition coming to his ammunition depot including their type, quantity, mode of transportation, date of arrival on a routine basis (almost every time it came to his notice).
• Details of ammunition (to include their type, quantity and mode/date of transportation) further distributed/transferred to local army establishments/units (including two local brigades) and elsewhere from his ammunition depot.
• ORBAT (Order of battle; composition related details) of two local army brigades and all changes in them as they came to his notice.
• Name, rank and personality traits of some Senior Military Officers in the two army brigades nearby, his ammunition depot and others who visited the military station.
• Photos of arms, ammunition, tanks other military vehicles (with their tactical numbers) at MFFR whenever he could visit it after April 2019.
Vikas also confessed to having received at least Rs 75,000 in total from his Pakistani handler for the information he has shared during this entire period. He used to receive them mostly on bank accounts of his and his brother, Hemant Kumar. The latter was found to have no links to the espionage case otherwise. Out of this sum, he had paid approximately Rs 9,000 in total to Chiman Lal for his assistance in lots of Rs 1000- Rs 2000 since their first meet.
Comments
anybody got their grevences answered here
corporation lights of cemetrey not glowing since two months. On 1st November 2019 is holy souls day. Kindly repair the lights at the earliest.
Fr. Joseph J. Lobo
Parish Priest
Street light is not working since 15 days. On 23rd July 2019 complaint lodged with Mobile No7353933410. Till date they are not responding
hello / madam
Keeping the city clean is our duty. I know not everybody is following that. We need some awareness program
to keep our city clean green and hygenic. Its our duty to keep the environment clean and place around us.
But it is also the duty of Corporation to maintain the cleanliness aroud the city, in some parts of the city like market, near clock tower circle its not been getting cleaned from past few days. Please do the needfull for betterment of tomorrow
thank you
Dear Madam, I have purchased 1 BHK flat in Green City, Vamadapadav on October, 2013 and paid full amount to builder T3 Urban Developers LTD. As per agreement possession was in December, 2015 but still building is not ready.
There were 5 buildings in Green City and at a time builder started 3 buildings construction work. I have purchased middle of the building and that building 1st floor slab only completed and since long time work stopped.
Last year builder agreed to give me flat in 1st building but building’s interior work is still pending and since 1 year work totally stopped.
Presently builder is not picking call or not responding for query. It seems that he is cheating with me. Kindly help me to resolve this issue. I will be grateful to you.
Sir/Madam,
Four street lights are not working on Raghavendra Matt Road, Hosabettu, Surathkal since long.
The roads are in Shabby condition and hence difficult in the night to Padastrians.
Kindly arrange to replace the treet lights on Main road, Raghavendra Matt Road, Hosabettu, near and after the Areca Field.
the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.
the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all.
both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.
in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.
now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.
Street light not working at kulai kavinakallu 2nd street
Relevant department has to look into the matter seriously and work on it and mark the matter as closed so that its notified as closed. Its a good move for public and public workers to work hand in hand
Add new comment