Nanded, May 24: In a sensational incident, a Lingayat seer from Karnataka was found murdered in his mutt in the Nanded district of Marathwada region of Maharashtra on Sunday.
The seer, who was strangled to death, has been identified as Shivacharya Nirvanarudra Pashupatinath Maharaj, the founder-spiritual head of Nirvanji Pashupatinath Mutt.
Addressing media persons, Nanded Superintendent of Police Vijaykumar Magar, the prime suspect, Sainath Langote first killed his accomplice Bhagwan Shinde and then went to the ashram late on Saturday.
He entered Shivaharya Maharaj's bedroom where he was resting and threw chilli powder in his eyes, blinding him.
Then he quickly grabbed cash of Rs 69,000, his laptop and other valuables in the bedroom worth approximately Rs.1.50 lakh, besides the seer's car keys.
As Shivacharya Maharaj attempted to grapple with him, Langote pinned him down and strangled him, then dragged his body to the sadhu's car parked outside and dumped it into the boot.
"He started the car and sped off towards the road outside, but the car crashed into the main gate of the ashram creating a noise, alerting the other sevaks sleeping inside the ashram," Magar said.
Around 8-10 other ashram sevaks rushed outside to check the ruckus and when they saw their seer's belongings and his body in the car trunck, they attempted to stop Langote, but he gave them the slip.
A short distance away, Langote managed to steal a motorbike and sped off into the darkness and hours later, the police found the body of his accomplice Shinde from a nearby school premises, Magar said.
In view of the sensitivity of the incident, Magar said around five crack teams were formed which fanned out into the district and managed to catch Langote this afternoon.
"The prima facie motive for the seer's murder was clearly robbery and the second killing could be due to rivalry or some differences among them. The absconder suspect has been caught by a police team. We will interrogate him and get further details of the crime," Magar said.
Nanded Congress strongman and PWD Minister Ashok Chavan appealed that the murder should not be politicized, since the police investigations are underway and the autopsy report is awaited.
He said the deceased sadhu belonged to the Lingayat caste, and both Shinde and Langote who belonged to the same community were his followers.
Shivacharya Maharaj had come to Nanded over a decade ago and set up the ashram which he ran along with a band of followers.
Comments
anybody got their grevences answered here
corporation lights of cemetrey not glowing since two months. On 1st November 2019 is holy souls day. Kindly repair the lights at the earliest.
Fr. Joseph J. Lobo
Parish Priest
Street light is not working since 15 days. On 23rd July 2019 complaint lodged with Mobile No7353933410. Till date they are not responding
hello / madam
Keeping the city clean is our duty. I know not everybody is following that. We need some awareness program
to keep our city clean green and hygenic. Its our duty to keep the environment clean and place around us.
But it is also the duty of Corporation to maintain the cleanliness aroud the city, in some parts of the city like market, near clock tower circle its not been getting cleaned from past few days. Please do the needfull for betterment of tomorrow
thank you
Dear Madam, I have purchased 1 BHK flat in Green City, Vamadapadav on October, 2013 and paid full amount to builder T3 Urban Developers LTD. As per agreement possession was in December, 2015 but still building is not ready.
There were 5 buildings in Green City and at a time builder started 3 buildings construction work. I have purchased middle of the building and that building 1st floor slab only completed and since long time work stopped.
Last year builder agreed to give me flat in 1st building but building’s interior work is still pending and since 1 year work totally stopped.
Presently builder is not picking call or not responding for query. It seems that he is cheating with me. Kindly help me to resolve this issue. I will be grateful to you.
Sir/Madam,
Four street lights are not working on Raghavendra Matt Road, Hosabettu, Surathkal since long.
The roads are in Shabby condition and hence difficult in the night to Padastrians.
Kindly arrange to replace the treet lights on Main road, Raghavendra Matt Road, Hosabettu, near and after the Areca Field.
the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.
the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all.
both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.
in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.
now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.
Street light not working at kulai kavinakallu 2nd street
Relevant department has to look into the matter seriously and work on it and mark the matter as closed so that its notified as closed. Its a good move for public and public workers to work hand in hand
Add new comment