Bengaluru, May 18: Karnataka chief minister B S Yediyurappa today announced lockdown relaxations from tomorrow (May 19) across the state. As per new guidelines public transport services will start operations outside COVID-19 containment zones in the state.
“To facilitate easy movements of citizens, services of the BMTC, KSRTC, NEKRTC and NWKRTC will start from Tuesday morning, except in containment zones. Even private buses can ply,” Yediyurappa said, after discussing the Centre's Lockdown 4.0 guidelines with his Cabinet colleagues and officials.
“The only condition is that only 30 people should travel in one bus so as to ensure social distancing,” the CM said.
He also clarified that bus fares will not be hiked. “I know there will be losses incurred. The government will bear the losses,” he said.
Auto rickshaws, taxis and maxi cabs (six-passenger vehicles) will also be allowed to operate. “Auto rickshaws and taxis will have a driver and two passengers. Maxi cabs will have a driver and three passengers,” Yediyurappa said.
All parks in the state will be open 7 am to 9 am and 5 pm to 7 pm.
Starting Tuesday, all shops except malls and theatres can open. “This includes salons,” the CM said.
All relaxation will cease to exist every Sunday, the CM said. “Every Sunday will be a complete lockdown. There’ll be no shops and the movement of people. It’ll be a complete rest day,” he said.
The existing curfew from 7 pm to 7 am will continue on all days, which means public transport services will not be allowed during this time.
Trains will run within the state, but interstate trains will not be allowed till May 31, the CM said.
It is mandatory for citizens to wear masks in public. “Not wearing a mask will be penalised,” Yediyurappa said.
On the classification of zones, Yediyurappa said the government's main focus was containment zones. “We're particular about containment zones. In the Karwar district, for example, Bhatkal will be a containment zone and no other taluk will have restrictions,” he said.
However, the government will review the relaxation based on how things pan out. “States have been given the freedom, so we can withdraw or modify as necessary,” he said.
Comments
anybody got their grevences answered here
corporation lights of cemetrey not glowing since two months. On 1st November 2019 is holy souls day. Kindly repair the lights at the earliest.
Fr. Joseph J. Lobo
Parish Priest
Street light is not working since 15 days. On 23rd July 2019 complaint lodged with Mobile No7353933410. Till date they are not responding
hello / madam
Keeping the city clean is our duty. I know not everybody is following that. We need some awareness program
to keep our city clean green and hygenic. Its our duty to keep the environment clean and place around us.
But it is also the duty of Corporation to maintain the cleanliness aroud the city, in some parts of the city like market, near clock tower circle its not been getting cleaned from past few days. Please do the needfull for betterment of tomorrow
thank you
Dear Madam, I have purchased 1 BHK flat in Green City, Vamadapadav on October, 2013 and paid full amount to builder T3 Urban Developers LTD. As per agreement possession was in December, 2015 but still building is not ready.
There were 5 buildings in Green City and at a time builder started 3 buildings construction work. I have purchased middle of the building and that building 1st floor slab only completed and since long time work stopped.
Last year builder agreed to give me flat in 1st building but building’s interior work is still pending and since 1 year work totally stopped.
Presently builder is not picking call or not responding for query. It seems that he is cheating with me. Kindly help me to resolve this issue. I will be grateful to you.
Sir/Madam,
Four street lights are not working on Raghavendra Matt Road, Hosabettu, Surathkal since long.
The roads are in Shabby condition and hence difficult in the night to Padastrians.
Kindly arrange to replace the treet lights on Main road, Raghavendra Matt Road, Hosabettu, near and after the Areca Field.
the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.
the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all.
both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.
in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.
now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.
Street light not working at kulai kavinakallu 2nd street
Relevant department has to look into the matter seriously and work on it and mark the matter as closed so that its notified as closed. Its a good move for public and public workers to work hand in hand
Add new comment