Dubai to invest $32-billion to build world's largest airport

November 30, 2014

Mumbai, Nov 30: To further secure its position as the world's aviation hub, Dubai Airports is building a whopping USD 32—billion greenfield airport at the upcoming Dubai World Central, 30 km off the present international airport which already is the second busiest in the world.dubai airport

The proposed new airport will become the world's largest aviation facility on completion and will have five runways which all will be simultaneously operational, all A380-compatible with a length of 4.5 km each.

“We are planning a USD 32—billion brand new airport at the Dubai World Central at Al Maktoum, 30 km off the present Dubai facility. In the first phase, the new airport will be able to handle 120 million passengers, which will go up to 200 million by 2020, when the project is completed,” Dubai Airports Corporate Communications Head Julius Baumann told media persons.

“On completion, the new airport will be the world's largest airport, with each concourse the size of seven football fields and have five runways which all will be simultaneously operational, all A380-compatible,” Mr. Baumann said.

The other features include 200 aircraft stands for wide bodied aircraft, four concourses connected via six airport trains to two terminals, which in turn will be linked to the city's metro network. When complete, the mega-hub will have total annual capacity exceeding 200 million passengers and 12 million tonne of freight.

The existing Al Maktoum International opened its doors to passengers on October 27, 2013 and three airlines are operating from here. It has one A380 capable runway, 64 remote stands, one cargo terminal with annual capacity for 250,000 tonne and a fully operational passenger terminal building designed to accommodate 5 million passengers annually.

The Dubai International Airport is the world's second busiest airport after the London Heathrow and is on course to become the global aviation hub, thanks to its geographical location and the availability of cheap fuel.

The first phase of the new airport includes a single A380 compatible runway, a passenger terminal with capacity of 5 million passengers which is expandable to 7 million; a cargo terminal with a capacity of 250,000 tonne per annum and expandable to 600,000 tonne and a 92-metre air traffic control tower.

The state-owned Dubai Airports already operates the Dubai International Airport in the heart of the Arabian megapolis and the Al Maktoum International Airport at the upcoming Dubai World Central (DWC).

The DWC is a 140 sq km new international city being built to de-congest the present city, Dubai Airports' Marketing & Corporate Communications Manager Zaigham Ali said, adding the work on new airport will begin early next year.

Apart from the new airport plan, the Emirate is also expanding the Dubai International Airport with a USD 7.8 billion investment to take the capacity to 100 million by 2020. This project was started in 2011 and will be completed by 2016.

The expansion of the Dubai International include a new concourse (Concourse D), expansion of Terminal 2 to twice its current capacity, refurbishment of Terminal 1, and additional aircraft stands, taxiways and aprons among others.

Dubai International, Mr. Baumann said handled 66.43 million passengers in 2013, and has being growing 15.5 per cent per annum since its launch in 1960. In 2013, it was named the second busiest airport in the world after the London Heathrow.

Mr. Ali said India is the largest source market for the airport, with an airline network that connects Dubai with 18 cities in the country.

In 2013, the airport saw a 14.3 percent increase in passenger numbers from India at 8.5 million and in the first 9 months of this year, the number has already crossed 7 million.

Mr. Ali added the company is confident of crossing the last year's mark this year.

Explaining the rationale for a gigantic new airport, Mr. Baumann said the airport's forecast figures for unconstrained passenger traffic show 126 million passengers by 2020, and 300 million passengers by 2050.

Additionally, the Terminal 2 will double in capacity by 2015. Concourse D of the airport, slated to open by mid 2015, will provide for 100 more aircraft and taking the figure up to 80 million passengers.

In all, the expansion projects will take the airport's passenger capacity to a little over 100 million passengers, Mr. Ali said.

With a built-up area of 1,972,474 sqm, the Dubai International Airport comprises three terminals and ranks among the world's top two busiest airports for international passengers, serving over 125 airlines flying to over 260 destinations, as per the Airports Council International.

On the economic impact of the aviation sector in Baumann, quoting an Oxford Economics report said, aviation will contribute USD 53.1 billion to Dubai's economy, which is 37.5 per cent to its GDP and will support over 750,000 jobs by the turn of 2020.

The aviation sector as a whole contributed USD 26.7 billion to the Dubai economy in 2013, which was almost 27 per cent of the national GDP and supported 416,500 jobs accounting for 21 per cent of the Emirates' total employment.

Passenger traffic in September totalled 5,942,628 compared to 5,407,326 recorded in the same month last year, an increase of 9.9 per cent. January—September rose 6.2 per cent to 52,422,547, up from 49,379,165, while in 2013, the passenger traffic stood 66,431,533, up 15.2 per cent from 2012.

Comments

Herman
 - 
Wednesday, 6 Apr 2016

Hello just wanted to give you a quick heads up.

The text in your post seem to be running off the screen in Opera.

I'm not sure if this is a format issue or something to do with browser compatibility but I
figured I'd post to let you know. The style and design look
great though! Hope you get the problem fixed soon.
Thanks

Also visit my web-site casio or yamaha keyboard: http://www.Aspenaftercare.com/?option=com_k2&view=itemlist&task=user&id…

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
coastaldigest.com news network
May 25,2020

Bengaluru, May 25: Helpless dairy farmers in a village in Bangaluru Rural district have dumped around 4,000 litres of milk into drains and on anthills.

The shocking incident took place at Chikka Korati near Hoskote yesterday after the Karnataka Milk Federation (KMF) refused to collect the milk because a pregnant woman in the village had tested positive for Covid-19.

The village was sealed off three days ago and three of the woman’s family was sent to institutional quarantine. The incident is an embarrassment since the government has been urging people not to stigmatise patients or their contacts.

“In Hoskote taluk, we lead in milk production,” Guru Korati, a villager, said. “There are around 130 families in the village, but we have two milk producers’ cooperative societies (MPCSs) – Chikka Korati MPCS and Dinne Korati MPCS. Our village produces more than 4,000 litres per day. The KMF refused to collect milk from both societies after they learnt about the positive case. Frustrated, we poured the milk down the drain.”

Guru wanted the government to address the village’s problems. “We are not only struggling to sell milk, but we also cannot transport vegetables which we cultivate,” he said.

Veerabhadrappa, from Chikka Korati in Bayala Narasapura gram panchayat, said: “Several families have cows enough to yield more than 50 litres of milk. What will they do with such a huge quantity of milk?”

Mehaboob Sab, panchayat development officer (PDO) of Bayala Narasapura GP, said, “We aren’t sure how the woman contracted Covid-19. A family member had visited Tamil Nadu and the woman also frequently visited a hospital in Kolar for checkups. We are still tracing her contacts.” 

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
May 23,2020

Mangaluru, May 23: Domestic flight services will resume from Mangaluru International Airport (MIA) from May 25 as per the instructions of Union Civil Aviation Ministry. Six Indigo and SpiceJet flights will be operated from Mangaluru to Bengaluru, Mumbai and Chennai.

Air-India is yet to finalise its schedule, airport sources said. Three Indigo flights will depart from Mangaluru to Bengaluru, Mumbai and Chennai and three flights of SpiceJet will leave for Bengaluru and Mumbai on May 25.

SpiceJet flight will take off from Bengaluru to Mangaluru at 8.30 am and7 pm while Indigo will take off from Mangaluru to Bengaluru at 5.55 pm. SpiceJet flight will take off from Mangaluru at 10.20 am and 9.35 pm while Indigo will depart at 7.30 pm.

From Mumbai, Spice Jet flight will take off at 7.05 am and Indigo at 9.30 am. The Mangaluru-Mumbai SpiceJet flight will take off at 9.05 am and Indigo at 11.40 am. Indigo flight will depart from Chennai to Mangaluru at 5.45 pm and from Mangaluru to Chennai at 8.05 am.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
April 12,2020

Mangaluru, Apr 12: Kanara Chamber of Commerce and Industry (KCCI) has appealed to the Additional Chief Secretary to Karnataka government Jawaid Akhtar to exclude Dakshina Kannada district from hotspot/ red zone area pertaining to coronavirus, saying that the district has not reported any new case since last five days.

KCCI president Isaac Vas said DK district has not reported any new case of COVID-19 in the last five days. Of the 12 cases reported in the district, six are from Kasargod and one from Bhatkal.

None of the patients suffering from coronavirus are in ICU or put on ventilator, he said in a statement.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.