Dubai to invest $32-billion to build world's largest airport

November 30, 2014

Mumbai, Nov 30: To further secure its position as the world's aviation hub, Dubai Airports is building a whopping USD 32—billion greenfield airport at the upcoming Dubai World Central, 30 km off the present international airport which already is the second busiest in the world.dubai airport

The proposed new airport will become the world's largest aviation facility on completion and will have five runways which all will be simultaneously operational, all A380-compatible with a length of 4.5 km each.

“We are planning a USD 32—billion brand new airport at the Dubai World Central at Al Maktoum, 30 km off the present Dubai facility. In the first phase, the new airport will be able to handle 120 million passengers, which will go up to 200 million by 2020, when the project is completed,” Dubai Airports Corporate Communications Head Julius Baumann told media persons.

“On completion, the new airport will be the world's largest airport, with each concourse the size of seven football fields and have five runways which all will be simultaneously operational, all A380-compatible,” Mr. Baumann said.

The other features include 200 aircraft stands for wide bodied aircraft, four concourses connected via six airport trains to two terminals, which in turn will be linked to the city's metro network. When complete, the mega-hub will have total annual capacity exceeding 200 million passengers and 12 million tonne of freight.

The existing Al Maktoum International opened its doors to passengers on October 27, 2013 and three airlines are operating from here. It has one A380 capable runway, 64 remote stands, one cargo terminal with annual capacity for 250,000 tonne and a fully operational passenger terminal building designed to accommodate 5 million passengers annually.

The Dubai International Airport is the world's second busiest airport after the London Heathrow and is on course to become the global aviation hub, thanks to its geographical location and the availability of cheap fuel.

The first phase of the new airport includes a single A380 compatible runway, a passenger terminal with capacity of 5 million passengers which is expandable to 7 million; a cargo terminal with a capacity of 250,000 tonne per annum and expandable to 600,000 tonne and a 92-metre air traffic control tower.

The state-owned Dubai Airports already operates the Dubai International Airport in the heart of the Arabian megapolis and the Al Maktoum International Airport at the upcoming Dubai World Central (DWC).

The DWC is a 140 sq km new international city being built to de-congest the present city, Dubai Airports' Marketing & Corporate Communications Manager Zaigham Ali said, adding the work on new airport will begin early next year.

Apart from the new airport plan, the Emirate is also expanding the Dubai International Airport with a USD 7.8 billion investment to take the capacity to 100 million by 2020. This project was started in 2011 and will be completed by 2016.

The expansion of the Dubai International include a new concourse (Concourse D), expansion of Terminal 2 to twice its current capacity, refurbishment of Terminal 1, and additional aircraft stands, taxiways and aprons among others.

Dubai International, Mr. Baumann said handled 66.43 million passengers in 2013, and has being growing 15.5 per cent per annum since its launch in 1960. In 2013, it was named the second busiest airport in the world after the London Heathrow.

Mr. Ali said India is the largest source market for the airport, with an airline network that connects Dubai with 18 cities in the country.

In 2013, the airport saw a 14.3 percent increase in passenger numbers from India at 8.5 million and in the first 9 months of this year, the number has already crossed 7 million.

Mr. Ali added the company is confident of crossing the last year's mark this year.

Explaining the rationale for a gigantic new airport, Mr. Baumann said the airport's forecast figures for unconstrained passenger traffic show 126 million passengers by 2020, and 300 million passengers by 2050.

Additionally, the Terminal 2 will double in capacity by 2015. Concourse D of the airport, slated to open by mid 2015, will provide for 100 more aircraft and taking the figure up to 80 million passengers.

In all, the expansion projects will take the airport's passenger capacity to a little over 100 million passengers, Mr. Ali said.

With a built-up area of 1,972,474 sqm, the Dubai International Airport comprises three terminals and ranks among the world's top two busiest airports for international passengers, serving over 125 airlines flying to over 260 destinations, as per the Airports Council International.

On the economic impact of the aviation sector in Baumann, quoting an Oxford Economics report said, aviation will contribute USD 53.1 billion to Dubai's economy, which is 37.5 per cent to its GDP and will support over 750,000 jobs by the turn of 2020.

The aviation sector as a whole contributed USD 26.7 billion to the Dubai economy in 2013, which was almost 27 per cent of the national GDP and supported 416,500 jobs accounting for 21 per cent of the Emirates' total employment.

Passenger traffic in September totalled 5,942,628 compared to 5,407,326 recorded in the same month last year, an increase of 9.9 per cent. January—September rose 6.2 per cent to 52,422,547, up from 49,379,165, while in 2013, the passenger traffic stood 66,431,533, up 15.2 per cent from 2012.

Comments

Herman
 - 
Wednesday, 6 Apr 2016

Hello just wanted to give you a quick heads up.

The text in your post seem to be running off the screen in Opera.

I'm not sure if this is a format issue or something to do with browser compatibility but I
figured I'd post to let you know. The style and design look
great though! Hope you get the problem fixed soon.
Thanks

Also visit my web-site casio or yamaha keyboard: http://www.Aspenaftercare.com/?option=com_k2&view=itemlist&task=user&id…

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
March 16,2020

Bengaluru, Mar 16: A 23-year-old mobile app developer was arrested on Saturday for allegedly forging the signature of Infosys Foundation chairperson Sudha Murty to rope in Telugu actor Vijay Devarakonda as an app’s ambassador.

The arrest of Laveti Sai Krishna alias Krishna ML, a resident of Hyderabad, comes a year after the case was registered. Jayanagar police registered a case against Krishna on February 26, 2019 based on a complaint filed by Lt Col (retd) M Ramesh, representative of Infosys Foundation. The complaint was filed after the forged letter didn’t reach Devarakonda and came back to Infosys Foundation instead.

App developer is a B.Pharma holder

“We conducted an investigation and traced the app designer. We caught him and based on information provided by him, we learnt that Krishna was the brain behind the forged signature,” a senior police officer said.

Krishna confessed that he developed a mobile app — ‘Offer nearby’ — and planned to launch it in a big way. He wanted Telugu actor Vijay Devarakonda to be the app’s brand ambassador and tried contacting him. Krishna, however, was unable to meet Vijay.

Krishna then thought he could easily reach the actor if he sent a recommendation letter in the name of Sudha Murty.

“He forged the letterhead of Infosys Foundation and Sudha Murty’s signature. We are verifying his antecedents to know if he committed any other offence earlier,” said Rohini Sepat-Katoch, DCP (south). Rohini said Krishna is a B.Pharma holder and worked with an advertisement firm. Later, he planned to develop an app that provides details of offers for retail customers. He floated Laveti Technologies, and with help from a friend, developed ‘Offer nearby’.

As per the complaint, Krishna created a fake letterhead in the name of Sudha Murty and wrote to Devarakonda, asking him to become the brand ambassador/ partner for his mobile app. Krishna sent it through SpeedPost mentioning the sender’s address as Infosys Foundation. Krishna’s game was up when the letter, which wasn’t delivered to Devarakonda, came back to Infosys Foundation.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
January 4,2020

Puttur, Jan 4: As many as 27 passengers travelling in a private bus escaped with minor injuries after it toppled and fell into a roadside trench at Amai near Perne on Mangaluru-Bengaluru national highway last night, police said on Saturday.

Police said that the driver of the Bengaluru-bond bus lost control over the vehicle while traversing through the narrow bridge at Amai.

The bus was damaged in the mishap.

Comments

SAYED HUSAIN
 - 
Sunday, 5 Jan 2020

this is one of the important case that now seen to be increasing these days.  and one of the most problem that is faced and had has to be found a solution is overspeeding by bus driving which have resulted in enomours numbers of accidents with negligence of passengers lifes inside the bus.  passengers safety and lifes are not given value anymore. and another important factor is overspeeding in humps  which have resulted in backbone injuries in high number of passengers

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
coastaldigest.com news network
March 27,2020

Mangaluru, Mar 27: In a shocking development, an infant with no travel history tests positive for the deadly novel coronavirus in Dakshina Kannada, taking the total coronavirus positive cases to six. 

The 10-month-old child, hailing from Sajipanadu Village in Bantwal Taluk was admitted to a hospital at Deralakatte in Mangaluru for treatment on March 23 as it had developed respiratory problems. 

On March 24, the child’s condition worsened and hence his throat swabs was sent for COVID-19 testing. Today, reports of the tests confirmed that the child was infected with COVID-19.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.