Dubai to invest $32-billion to build world's largest airport

November 30, 2014

Mumbai, Nov 30: To further secure its position as the world's aviation hub, Dubai Airports is building a whopping USD 32—billion greenfield airport at the upcoming Dubai World Central, 30 km off the present international airport which already is the second busiest in the world.dubai airport

The proposed new airport will become the world's largest aviation facility on completion and will have five runways which all will be simultaneously operational, all A380-compatible with a length of 4.5 km each.

“We are planning a USD 32—billion brand new airport at the Dubai World Central at Al Maktoum, 30 km off the present Dubai facility. In the first phase, the new airport will be able to handle 120 million passengers, which will go up to 200 million by 2020, when the project is completed,” Dubai Airports Corporate Communications Head Julius Baumann told media persons.

“On completion, the new airport will be the world's largest airport, with each concourse the size of seven football fields and have five runways which all will be simultaneously operational, all A380-compatible,” Mr. Baumann said.

The other features include 200 aircraft stands for wide bodied aircraft, four concourses connected via six airport trains to two terminals, which in turn will be linked to the city's metro network. When complete, the mega-hub will have total annual capacity exceeding 200 million passengers and 12 million tonne of freight.

The existing Al Maktoum International opened its doors to passengers on October 27, 2013 and three airlines are operating from here. It has one A380 capable runway, 64 remote stands, one cargo terminal with annual capacity for 250,000 tonne and a fully operational passenger terminal building designed to accommodate 5 million passengers annually.

The Dubai International Airport is the world's second busiest airport after the London Heathrow and is on course to become the global aviation hub, thanks to its geographical location and the availability of cheap fuel.

The first phase of the new airport includes a single A380 compatible runway, a passenger terminal with capacity of 5 million passengers which is expandable to 7 million; a cargo terminal with a capacity of 250,000 tonne per annum and expandable to 600,000 tonne and a 92-metre air traffic control tower.

The state-owned Dubai Airports already operates the Dubai International Airport in the heart of the Arabian megapolis and the Al Maktoum International Airport at the upcoming Dubai World Central (DWC).

The DWC is a 140 sq km new international city being built to de-congest the present city, Dubai Airports' Marketing & Corporate Communications Manager Zaigham Ali said, adding the work on new airport will begin early next year.

Apart from the new airport plan, the Emirate is also expanding the Dubai International Airport with a USD 7.8 billion investment to take the capacity to 100 million by 2020. This project was started in 2011 and will be completed by 2016.

The expansion of the Dubai International include a new concourse (Concourse D), expansion of Terminal 2 to twice its current capacity, refurbishment of Terminal 1, and additional aircraft stands, taxiways and aprons among others.

Dubai International, Mr. Baumann said handled 66.43 million passengers in 2013, and has being growing 15.5 per cent per annum since its launch in 1960. In 2013, it was named the second busiest airport in the world after the London Heathrow.

Mr. Ali said India is the largest source market for the airport, with an airline network that connects Dubai with 18 cities in the country.

In 2013, the airport saw a 14.3 percent increase in passenger numbers from India at 8.5 million and in the first 9 months of this year, the number has already crossed 7 million.

Mr. Ali added the company is confident of crossing the last year's mark this year.

Explaining the rationale for a gigantic new airport, Mr. Baumann said the airport's forecast figures for unconstrained passenger traffic show 126 million passengers by 2020, and 300 million passengers by 2050.

Additionally, the Terminal 2 will double in capacity by 2015. Concourse D of the airport, slated to open by mid 2015, will provide for 100 more aircraft and taking the figure up to 80 million passengers.

In all, the expansion projects will take the airport's passenger capacity to a little over 100 million passengers, Mr. Ali said.

With a built-up area of 1,972,474 sqm, the Dubai International Airport comprises three terminals and ranks among the world's top two busiest airports for international passengers, serving over 125 airlines flying to over 260 destinations, as per the Airports Council International.

On the economic impact of the aviation sector in Baumann, quoting an Oxford Economics report said, aviation will contribute USD 53.1 billion to Dubai's economy, which is 37.5 per cent to its GDP and will support over 750,000 jobs by the turn of 2020.

The aviation sector as a whole contributed USD 26.7 billion to the Dubai economy in 2013, which was almost 27 per cent of the national GDP and supported 416,500 jobs accounting for 21 per cent of the Emirates' total employment.

Passenger traffic in September totalled 5,942,628 compared to 5,407,326 recorded in the same month last year, an increase of 9.9 per cent. January—September rose 6.2 per cent to 52,422,547, up from 49,379,165, while in 2013, the passenger traffic stood 66,431,533, up 15.2 per cent from 2012.

Comments

Herman
 - 
Wednesday, 6 Apr 2016

Hello just wanted to give you a quick heads up.

The text in your post seem to be running off the screen in Opera.

I'm not sure if this is a format issue or something to do with browser compatibility but I
figured I'd post to let you know. The style and design look
great though! Hope you get the problem fixed soon.
Thanks

Also visit my web-site casio or yamaha keyboard: http://www.Aspenaftercare.com/?option=com_k2&view=itemlist&task=user&id…

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
June 29,2020

Mangaluru, Jun 29: A hospital set up in 1848 in the Port City has to remain closed till July 5 as majority of the Doctors and Staff at Lady Goschen Government Hospital are quarantined after coming in contact with a COVID-19 infected person.

Hospital Medical Superintendent said that both in-patient and out-patient wings of the hospital will remain closed till July 5 as there is a need to fumigate and sanitise all the departments of the hospital. Patients for treatment under 'Ayushman Bharat – Arogya Karnataka' scheme will be sent to private medical colleges with the referral card from the hospital. The hospital will start functioning normally from July 6.

The Lady Goschen Government Hospital, earlier known as the maternity Hospital, is the oldest hospital in the district and dates back to 1848.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
July 16,2020

Bengaluru, Jul 16: Rattled by the spurt in Covid-19 positive cases, a Karnataka minister on Wednesday said only god would save the people from coronavirus pandemic.

"Only god has to save us from the virus or the people should be made aware of the infection so that they wear mask and maintain social distancing," state Health Minister B Sriramulu told reporters in Chitradurga, 205-km northwest of Bengaluru.

Noting that the infection does not differentiate between rich and poor, police, doctors, politicians or legislators, Sriramulu said the communicable disease could rise to alarming level in the ensuing two months, as the cases were rising daily the world over.

"Who can control coronavirus? In the present situation, only god has to save us. Otherwise, the people should become aware of its (virus) consequences. If we have made mistakes, we are ready to face punishment for them," said Sriramulu, who is the ruling BJP's legislator from the Molakalmuru reserved assembly segment in the district.

Refuting the opposition Congress charge that the cases were rising in the state due to negligence by ministers, officials and legislators, Sriramulu said Karnataka was performing better than other states till the cases began to steadily rise since unlock started and the people were moving in violation of the guidelines.

A record 3,176 cases were reported from across the southern state during the day, taking the Covid tally to a whopping 47,253, including 27,853 active cases after 18,466 were discharged, with 1,076 during the day, while 928 succumbed to the virus, with 87 in the last 24 hours.

In Bengaluru, which is under 9-day lockdown since Tuesday night till July 22 morning, 1,975 positive cases were registered, taking its tally to 22,944, including 17,051 active after 5,455 were discharged so far, with 463 during the day, while 437 died of the infection, with 60 in the last 24 hours.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
June 19,2020

Bengaluru, Jun 19: The Karnataka government has been advised by its Educational Advisor to cancel holidays observed in educational institutions on the occasion of various Jayantis (birth annivesaries).

Advisor to Karnataka government on Education, Professor MR Doreswamy, has recommended cancellation of holidays on Jayanti and celebrate the day with more meaningful programmes remembering the great personalities.

The state government has declared public holidays on Valmiki Jayanti, Basava Jayanti, Kanaka Jayanti, Mahavir Jayanti, Ambedkar Jayanti and Gandhi Jayanti.

On Thursday, Doreswamy submitted a report containing seven key suggestions including cancelling holidays, to Deputy Chief Minister CN Aswath Narayan, who holds higher education portfolio.

Doreswamy in his report suggested to hold thematic workshops, lectures, conferences and other such activities to celebrate the life and works of the great personalities, instead of declaring holidays.

"It would not only educate our youth about the significance of the great personalities to our culture and society and also reinvents the tradition of paying tributes to their contributions to our civil society,'' he said.

Dr Narayan said that the decision on cancelling holidays on Jayanti's has to be taken by Chief Minister BS Yediyurappa.

Moreover, to bring education back on track during the present COVID-19 pandemic situation, Doreswamy made a few suggestions to complete exams of final semester engineering and graduate students. He also said that it was a challenge for the education sector to overcome the pandemic crisis and structure the next academic year 2021-22.

He also advised implementation of a mentoring system in all higher education institutions in Karnataka and empowering specially-abled students.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.