Dubai to invest $32-billion to build world's largest airport

November 30, 2014

Mumbai, Nov 30: To further secure its position as the world's aviation hub, Dubai Airports is building a whopping USD 32—billion greenfield airport at the upcoming Dubai World Central, 30 km off the present international airport which already is the second busiest in the world.dubai airport

The proposed new airport will become the world's largest aviation facility on completion and will have five runways which all will be simultaneously operational, all A380-compatible with a length of 4.5 km each.

“We are planning a USD 32—billion brand new airport at the Dubai World Central at Al Maktoum, 30 km off the present Dubai facility. In the first phase, the new airport will be able to handle 120 million passengers, which will go up to 200 million by 2020, when the project is completed,” Dubai Airports Corporate Communications Head Julius Baumann told media persons.

“On completion, the new airport will be the world's largest airport, with each concourse the size of seven football fields and have five runways which all will be simultaneously operational, all A380-compatible,” Mr. Baumann said.

The other features include 200 aircraft stands for wide bodied aircraft, four concourses connected via six airport trains to two terminals, which in turn will be linked to the city's metro network. When complete, the mega-hub will have total annual capacity exceeding 200 million passengers and 12 million tonne of freight.

The existing Al Maktoum International opened its doors to passengers on October 27, 2013 and three airlines are operating from here. It has one A380 capable runway, 64 remote stands, one cargo terminal with annual capacity for 250,000 tonne and a fully operational passenger terminal building designed to accommodate 5 million passengers annually.

The Dubai International Airport is the world's second busiest airport after the London Heathrow and is on course to become the global aviation hub, thanks to its geographical location and the availability of cheap fuel.

The first phase of the new airport includes a single A380 compatible runway, a passenger terminal with capacity of 5 million passengers which is expandable to 7 million; a cargo terminal with a capacity of 250,000 tonne per annum and expandable to 600,000 tonne and a 92-metre air traffic control tower.

The state-owned Dubai Airports already operates the Dubai International Airport in the heart of the Arabian megapolis and the Al Maktoum International Airport at the upcoming Dubai World Central (DWC).

The DWC is a 140 sq km new international city being built to de-congest the present city, Dubai Airports' Marketing & Corporate Communications Manager Zaigham Ali said, adding the work on new airport will begin early next year.

Apart from the new airport plan, the Emirate is also expanding the Dubai International Airport with a USD 7.8 billion investment to take the capacity to 100 million by 2020. This project was started in 2011 and will be completed by 2016.

The expansion of the Dubai International include a new concourse (Concourse D), expansion of Terminal 2 to twice its current capacity, refurbishment of Terminal 1, and additional aircraft stands, taxiways and aprons among others.

Dubai International, Mr. Baumann said handled 66.43 million passengers in 2013, and has being growing 15.5 per cent per annum since its launch in 1960. In 2013, it was named the second busiest airport in the world after the London Heathrow.

Mr. Ali said India is the largest source market for the airport, with an airline network that connects Dubai with 18 cities in the country.

In 2013, the airport saw a 14.3 percent increase in passenger numbers from India at 8.5 million and in the first 9 months of this year, the number has already crossed 7 million.

Mr. Ali added the company is confident of crossing the last year's mark this year.

Explaining the rationale for a gigantic new airport, Mr. Baumann said the airport's forecast figures for unconstrained passenger traffic show 126 million passengers by 2020, and 300 million passengers by 2050.

Additionally, the Terminal 2 will double in capacity by 2015. Concourse D of the airport, slated to open by mid 2015, will provide for 100 more aircraft and taking the figure up to 80 million passengers.

In all, the expansion projects will take the airport's passenger capacity to a little over 100 million passengers, Mr. Ali said.

With a built-up area of 1,972,474 sqm, the Dubai International Airport comprises three terminals and ranks among the world's top two busiest airports for international passengers, serving over 125 airlines flying to over 260 destinations, as per the Airports Council International.

On the economic impact of the aviation sector in Baumann, quoting an Oxford Economics report said, aviation will contribute USD 53.1 billion to Dubai's economy, which is 37.5 per cent to its GDP and will support over 750,000 jobs by the turn of 2020.

The aviation sector as a whole contributed USD 26.7 billion to the Dubai economy in 2013, which was almost 27 per cent of the national GDP and supported 416,500 jobs accounting for 21 per cent of the Emirates' total employment.

Passenger traffic in September totalled 5,942,628 compared to 5,407,326 recorded in the same month last year, an increase of 9.9 per cent. January—September rose 6.2 per cent to 52,422,547, up from 49,379,165, while in 2013, the passenger traffic stood 66,431,533, up 15.2 per cent from 2012.

Comments

Herman
 - 
Wednesday, 6 Apr 2016

Hello just wanted to give you a quick heads up.

The text in your post seem to be running off the screen in Opera.

I'm not sure if this is a format issue or something to do with browser compatibility but I
figured I'd post to let you know. The style and design look
great though! Hope you get the problem fixed soon.
Thanks

Also visit my web-site casio or yamaha keyboard: http://www.Aspenaftercare.com/?option=com_k2&view=itemlist&task=user&id…

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
June 3,2020

Bengaluru, Jun 3: Kempegowda International Airport in Bengaluru on Tuesday intensified preventive measures to contain the spread of COVID-19 in a bid to make air-travel contactless.

The airport has introduced contact-less self-check-in kiosks, non-intrusive thermal cameras, self bag drop facility and other features.

Bangalore International Airport Limited (BIAL) had earlier said that it will ensure that the taxis are sanitised and the drivers are screened before every trip to eliminate all chances of infection.

"Drivers have been instructed to maintain a safe distance. They will be encouraged to use hand sanitiser and face masks to make the car a safe space. Able-bodied passengers are advised to load their luggage into the car without the driver's assistance. For elderly citizens and passengers with reduced mobility, drivers will assist while following hygiene measures," BIAL statement had said.

The masks have been made mandatory for both drivers as well as passengers.

Karnataka on Monday reported 187 new cases of coronavirus, with which the State's total COVID-19 count has surged to 3,408.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
January 1,2020

Mangaluru, Jan 1: Led by two local MLAs belonging to Bharatiya Janata Party, dozens of people today forcibly stopped toll fee collection at Talapady toll gate on the outskirts of the city allowing vehicles plying between Karnataka and Kerala on the national highway 66 to travel without paying any fee for some time.

Mangaluru City South MLA D Vedavyasa Kamath and Mangaluru City North MLA Y Bharat Shetty, who led the workers, said that the Navayuga Udupi Tollway Pvt. Ltd. (NUTPL), the concessionaire of the about 90-km-long highway widening project between Talapady and Kundapura in Karnataka, had failed to complete the project since over a decade.

The service roads and two flyovers under the project remained uncompleted. Hence motorists were facing a hardship. Notwithstanding Nalin Kumar Kateel, Dakshina Kannada MP, arranging ₹56 crore loan to the NUTPL through Axis Bank to complete the prominent Pumpwell flyover in the city, the company had failed to complete it.

The MLAs said that they stopped the toll collection as a symbolic protest to bring pressure on the company to complete the project within this month.

The BJP workers who gathered near the toll gate around 7.30 a.m. forcibly removed the barricades and made the vehicles ply without paying the fee. The workers of the company managing the toll booth did not resist.

The BJP workers said that vehicles would ply without paying toll till about 6 p.m. If the company resumed the collection during the day on Wednesday, the party workers would again forcibly stop it on Thursday, they said.

Shivaprasad Rai, in-charge of toll collection of the company at Talapady, Hejmady and Sasthana on the same highway told The Hindu that the NUTPL collected about ₹7 lakh as toll fee daily at Talapady from over 12,000 vehicles. The loss on Wednesday could be about ₹4 lakh.

The project is being implemented under build, operate and transfer basis.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
May 29,2020

Bantwal, Karnataka, May 29: Vitla Police have registered a case against four persons, including a Bajrang Dal leader, on charges of assaulting a boy and forcing him to chant 'Jai Shree Ram', video of which had gone viral on social media.

Police said on Friday that the accused have been identified as Bajrang Dal leader Dinesh, a resident of Kanyana, and two 16-year-old youngsters from Kolnadu village and a 17-year-old boy from Kanyana village. The victim of the assault has been identified as the first PUC student of Kudtumugaru.

On April 21, at around 11 am, four accused waylaid the boy's bike and started abusing him. They then dragged the boy to Kadumath High School grounds and assaulted and posed life threat. Besides, they forced him to chant ''Jai Shree Ram,'' he stated in the complaint.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.