Less than 8% Indian engineers fit for core engg roles

June 14, 2016

New Delhi, Jun 14: Significant efforts need to be made to improve employability in the engineering sector as less than 8 per cent of Indian engineers are employable in core engineering roles, reveals an Aspiring Minds' report.college-students

The National Employability Report for the first time this year looked into the employability of specialised and new careers, which are available to engineers, other than core IT and software roles.

The nationwide analysis based on a sample of 1,50,000 engineers showed there was a huge gap in skills of engineers, as needed, to work in the large industry.

"There are several problems with regard to employability in core engineering roles. We need to excite students about these jobs. Everyone's focus today is on IT. We want students to design and build things. We need emphasis on the basics, for instance, basic electrical engineering, basic concepts of mechanics and so on," Varun Aggarwal CTO Aspiring Minds said.

The government's Make in India initiative aspires to create manufacturing capacity in India and generate 100 million jobs by 2022.

Low employability of engineers, however, will impede the growth of manufacturing in India in a big way and requires immediate intervention, the employability assessment firm said.

Aggarwal noted that students do not have these basic concepts right. There is a huge need of a curriculum revamp and to bring in new teaching methods and technology.

"The science of manufacturing has moved way ahead but we continue to teach outdated concepts to students. For India to become the world's manufacturing hub, we need to lead from the front in our understanding of cutting edge methods, knowledge- driven management and implementation capability," he added.

Employability for roles like mechanical design engineer and civil engineer stand at a meagre 5.55 per cent and 6.48 per cent respectively.

The lowest employability percentage was recorded for the Chemical Design Engineer role at 1.64 per cent.

Employability in the domain specific roles is the highest for Electronics engineers at 7.07 per cent.

This percentage is considerably lower compared to employability in IT roles like Software Engineer - IT services and Associate ITeS Operations (Hardware Networking) which stood at 17.91 per cent and 37.06 per cent respectively.

The study on employability across metros reveals higher employability in Delhi and Mumbai with employability for the electronics design engineer role as high as 19 per cent followed by cities like Bengaluru, Kolkata and Hyderabad.

The lowest employability figures across roles is observed in Chennai with employability for the Civil Design Engineer role as low as 1 per cent, the report said.

Comments

Jamal
 - 
Thursday, 16 Jun 2016

Students passing out of IT engineering colleges in mangalore don't know how to code. Its like someone completing a driving course from driving school. But, when u give him a car to drive, he doesn't know how to drive.

I wonder what these so-called \engineering colleges\" teach."

Zahoor Ahmed
 - 
Wednesday, 15 Jun 2016

Our Honourable HRD Minister Dear Smriti is not interest to curriculam revamp,new teaching method or technology. instead she is interesting in Yoga, Sanskrit,dancing,acting to introduce in IIT and Engineering Institutions. LOL

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
February 29,2020

Bengaluru, Feb 28: Bengaluru Police Commissioner Bhaskar Rao on Friday said that Section 144 will be imposed near Vidhana Soudha for Budget session starting from March 2.

"Section 144 of the CrPC (prohibits assembly of more than 4 people in an area) will be imposed in the area around Vidhana Soudha from March 2 to March 31 ahead of the Budget session,"Bhaskar Rao said.

The police said that they have intelligence inputs of protests near Vidhana Soudha.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
January 12,2020

Mangalore, Jan 12: City police on Sunday arrested five people for their alleged involvement in a Rs 50 crore fraud by promising people higher monetary returns.

Police said that the arrested persons are Manjunath Nayak, a resident of Derebail; Denzil Mascarenhas, a Konchady resident; Ashok Naik, a Derebail resident; Vikas Nayak and Vishwanath Naik both residents of Bengaluru were arrested.

The arrested were employed in the ‘Speak and Group’ concern, started by Dhanush M K of Kundapur along with his friends. The firm had managed to collect huge sums of money from people, including NRIs by promising monthly four percent returns on their investment. The employees managed to entice people by showing them a few insurance schemes claiming higher returns.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
coastaldigest.com news network
February 8,2020

Mangaluru, Feb 8: A speeding car fell off the newly-inaugurated Pumpwell flyover in the city after jumping the median and ramming into an oncoming car today. 

At least four persons have suffered injuries in the mishap involving a Maruti Alto and a Renault Duster. The condition of two is said to be extremely critical. The other two have suffered minor injuries.

The accident took place when the driver of the speeding Alto which was heading towards Kasaragod from Udupi lost control over his vehicle.

Towards the end of the flyover, car rammed into the divider and then hit the ill-fated Renault Duster which was coming from the opposite direction. The Alto then fell off the bridge. 

The accident caused traffic jam on the highway for some time. The flyover was inaugurated a week ago, after a decade long wait.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.