Jun 6: Private sector lender Karnataka Bank has reported to the RBI that it has been defrauded of over Rs 285 crore consequent to loans gone bad to four entities including DHFL.
A total of Rs 285.52 crore has been reported as fraud wherein the bank was one of the consortium lenders during 2009 to 2014 to Dewan Housing Finance Corporation Ltd (DHFL), Religare Finvest, Fedders Electric and Engineering Ltd and Leel Electricals Ltd, Karnataka Bank said in a regulatory filing on Friday.
The maximum is owed by DHFL at Rs 180.13 crore, followed by Religare Finvest Rs 43.44 crore, Fedders Electric Rs 41.30 crore and Leel Electricals Rs 20.65 crore.
"DHFL (defaulted entity) dealing with us since 2014 had availed various credit facilities under consortium arrangement wherein, we were one of the member banks. In view of Early Warning Signals (EWS) in the conduct of the account and other developments, the account was red flagged on November 11, 2019.
"The borrowing account was classified as Non-Performing Asset on October 30, 2019 and now, for misappropriation & criminal breach of trust & diversion of funds in the credit facilities extended earlier to the company, a fraud amounting Rs 180.13 crore has been reported to RBI," Karnataka Bank said.
Likewise, Religare Finvest Ltd (RFL) was dealing with the bank since 2014, availing various credit facilities.
Following classification of this account as non-performing in October 2019 by a consortium member, Karnataka Bank reported to RBI a fraud amounting to Rs 43.44 crore in the credit facilities extended earlier, on account of diversion of funds.
Leel Electricals was classified as NPA account in March 2019 and it reported to RBI a fraud amounting to Rs 20.65 crore in the credit facilities to the company on account of diversion of funds.
"In all the referred three non-performing accounts, necessary provisions have been made in full to be spread across four quarters," it said.
Fedders Electric and Engineering Limited was reported as NPA in July 2018 by a member bank in consortium, subsequent to which Karnataka Bank reported fraud of Rs 41.30 crore on account of fund diversion.
The account has already been fully provided for, it added.
Comments
anybody got their grevences answered here
corporation lights of cemetrey not glowing since two months. On 1st November 2019 is holy souls day. Kindly repair the lights at the earliest.
Fr. Joseph J. Lobo
Parish Priest
Street light is not working since 15 days. On 23rd July 2019 complaint lodged with Mobile No7353933410. Till date they are not responding
hello / madam
Keeping the city clean is our duty. I know not everybody is following that. We need some awareness program
to keep our city clean green and hygenic. Its our duty to keep the environment clean and place around us.
But it is also the duty of Corporation to maintain the cleanliness aroud the city, in some parts of the city like market, near clock tower circle its not been getting cleaned from past few days. Please do the needfull for betterment of tomorrow
thank you
Dear Madam, I have purchased 1 BHK flat in Green City, Vamadapadav on October, 2013 and paid full amount to builder T3 Urban Developers LTD. As per agreement possession was in December, 2015 but still building is not ready.
There were 5 buildings in Green City and at a time builder started 3 buildings construction work. I have purchased middle of the building and that building 1st floor slab only completed and since long time work stopped.
Last year builder agreed to give me flat in 1st building but building’s interior work is still pending and since 1 year work totally stopped.
Presently builder is not picking call or not responding for query. It seems that he is cheating with me. Kindly help me to resolve this issue. I will be grateful to you.
Sir/Madam,
Four street lights are not working on Raghavendra Matt Road, Hosabettu, Surathkal since long.
The roads are in Shabby condition and hence difficult in the night to Padastrians.
Kindly arrange to replace the treet lights on Main road, Raghavendra Matt Road, Hosabettu, near and after the Areca Field.
the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.
the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all.
both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.
in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.
now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.
Street light not working at kulai kavinakallu 2nd street
Relevant department has to look into the matter seriously and work on it and mark the matter as closed so that its notified as closed. Its a good move for public and public workers to work hand in hand
Add new comment