
Bengaluru, Aug 2: All the seven Airports in Karnataka have seen poor traffic even after the restoration of domestic flight services post covid-19 lockdown. Interestingly, Mangaluru International Airport, the second biggest in the state, has slipped to third position in number of number of passengers and flights.
Of all the seven airports in State-- Bengaluru, Mangaluru, Hubballi, Belagavi, Mysuru, Kalaburagi and Vijaynagara (Hosapete)-- it was the Sambra (Belagavi) airport which saw the highest number of passengers and flights after Bengaluru.
According to Airports Authority of India report released on their website recently, the Sambra airport outperformed the Managluru international airport in June.
As many 10,224 passengers travelled to or from Belagavi airport in June, whereas Mangaluru airport saw a footfall of only 8,608 passengers including 3,726 international and 4,882 domestic passengers. Belagavi airport handled 391 flights whereas Mangaluru airport handled 190 flights.
Even the Bengaluru international airport saw a decline in the number of passengers and flights in June. Only 3.69 lakh domestic and 10,654 international passengers arrived or departed from Kempegowda International Airport, Bengaluru in June as against 27.59 lakh total passengers in June 2019.
Between April-June 2020 the Bengaluru airport saw only 4.54 lakh total passengers (domestic and international) as against 84.11 lakh total passenger during the same period last year. The number of flights to and from Bengaluru also saw a huge dip in June with only 731 international (2,582 in June 2019) and 4290 domestic (16,216 in June 2019) flights.
Though the Mysuru domestic airport handled a higher number of flights compared to last June, the number of passengers either arriving or departing saw a decline. Last year June 4,775 passengers travelled in 96 flights, whereas in June 2020 the airport handled 3,158 passengers and 330 flights.
Hubballi airport saw the least number of passengers or flights among the seven airports in Karnataka in June. It saw only 55 passengers either arriving or departing from the city's airport in 14 flights in the month of June. In the same month last year, Hubballi airport, which was third busiest before the pandemic, had facilitated 45,973 passengers and handled 604 flights.
Since April 2020 to June, the Hubballi airport has handled only 18 flights (as against 1,958 during the same period last year) and 122 passengers (1,50,416 between April-June 2019).
Comments
anybody got their grevences answered here
corporation lights of cemetrey not glowing since two months. On 1st November 2019 is holy souls day. Kindly repair the lights at the earliest.
Fr. Joseph J. Lobo
Parish Priest
Street light is not working since 15 days. On 23rd July 2019 complaint lodged with Mobile No7353933410. Till date they are not responding
hello / madam
Keeping the city clean is our duty. I know not everybody is following that. We need some awareness program
to keep our city clean green and hygenic. Its our duty to keep the environment clean and place around us.
But it is also the duty of Corporation to maintain the cleanliness aroud the city, in some parts of the city like market, near clock tower circle its not been getting cleaned from past few days. Please do the needfull for betterment of tomorrow
thank you
Dear Madam, I have purchased 1 BHK flat in Green City, Vamadapadav on October, 2013 and paid full amount to builder T3 Urban Developers LTD. As per agreement possession was in December, 2015 but still building is not ready.
There were 5 buildings in Green City and at a time builder started 3 buildings construction work. I have purchased middle of the building and that building 1st floor slab only completed and since long time work stopped.
Last year builder agreed to give me flat in 1st building but building’s interior work is still pending and since 1 year work totally stopped.
Presently builder is not picking call or not responding for query. It seems that he is cheating with me. Kindly help me to resolve this issue. I will be grateful to you.
Sir/Madam,
Four street lights are not working on Raghavendra Matt Road, Hosabettu, Surathkal since long.
The roads are in Shabby condition and hence difficult in the night to Padastrians.
Kindly arrange to replace the treet lights on Main road, Raghavendra Matt Road, Hosabettu, near and after the Areca Field.
the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.
the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all.
both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.
in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.
now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.
Street light not working at kulai kavinakallu 2nd street
Relevant department has to look into the matter seriously and work on it and mark the matter as closed so that its notified as closed. Its a good move for public and public workers to work hand in hand
Add new comment