Udupi, June 2: The number of positive cases may continue to be more in Udupi district since the results of more than 3,000 samples are pending with Labs.
The district total cases to 260. The figure had seemed far-fetched on May 15, when the number of cases stood at just three. The latest spike has been attributed to the return of migrants from other States as well as from abroad. These samples are from people who returned to the district in the last two weeks.
This delay is because the laboratories testing samples from Udupi are burdened with a high case-load after more than 8,500 people returned to the district, particularly from the neighbouring state of Maharashtra.
"Samples have piled up after the influx of people returning from other states and from abroad," says Dr Prashant Bhat, nodal officer for COVID-19 in Udupi. This delay has caused returnees in institutional quarantine to stay on for as long as 18 days.
The designated laboratory for coronavirus testing in Udupi is Wenlock District Hospital in Mangaluru. The district administration also sends samples to laboratories at the Kasturba Hospital in Manipal, Yenepoya Medical College, Mangaluru, KS Hegde Medical Academy, Mangaluru, and Viral Diagnostic Laboratory in Shivamogga. Apart from Udupi, the laboratory in Manipal is also testing samples from Uttara Kannada district. The laboratory in Shivamogga is also testing samples from Shivamogga and Bijapur districts. The laboratories in Mangaluru, similarly, have samples from Dakshina Kannada district.
Dr Avinash Shetty, Medical Superintendent of Kasturba Hospital in Manipal, one of the private laboratories being used by the Udupi district administration, said that they are testing samples in batches. "We received around 600 samples today and we will be testing them now. The backlog of samples should be cleared in the next few days," Dr Avinash said.
All 73 cases reported in Udupi on Monday were patients with travel history of returning from Maharashtra or patients with travel history of returning from abroad.
In cases of some patients who tested coronavirus positive in the past week, people were released from institutional quarantine after a stipulated period only to be tracked down again and admitted in hospitals after their results returned positive.
While two such cases emerged in Belapu and Belman in the district, the administration is now following up with others who were released from institutional quarantine to ensure they remain in home quarantine till their test results are confirmed.
The spike in cases among returning migrants in Udupi also comes at a time the Karnataka government reduced restrictions on interstate travel.
Comments
anybody got their grevences answered here
corporation lights of cemetrey not glowing since two months. On 1st November 2019 is holy souls day. Kindly repair the lights at the earliest.
Fr. Joseph J. Lobo
Parish Priest
Street light is not working since 15 days. On 23rd July 2019 complaint lodged with Mobile No7353933410. Till date they are not responding
hello / madam
Keeping the city clean is our duty. I know not everybody is following that. We need some awareness program
to keep our city clean green and hygenic. Its our duty to keep the environment clean and place around us.
But it is also the duty of Corporation to maintain the cleanliness aroud the city, in some parts of the city like market, near clock tower circle its not been getting cleaned from past few days. Please do the needfull for betterment of tomorrow
thank you
Dear Madam, I have purchased 1 BHK flat in Green City, Vamadapadav on October, 2013 and paid full amount to builder T3 Urban Developers LTD. As per agreement possession was in December, 2015 but still building is not ready.
There were 5 buildings in Green City and at a time builder started 3 buildings construction work. I have purchased middle of the building and that building 1st floor slab only completed and since long time work stopped.
Last year builder agreed to give me flat in 1st building but building’s interior work is still pending and since 1 year work totally stopped.
Presently builder is not picking call or not responding for query. It seems that he is cheating with me. Kindly help me to resolve this issue. I will be grateful to you.
Sir/Madam,
Four street lights are not working on Raghavendra Matt Road, Hosabettu, Surathkal since long.
The roads are in Shabby condition and hence difficult in the night to Padastrians.
Kindly arrange to replace the treet lights on Main road, Raghavendra Matt Road, Hosabettu, near and after the Areca Field.
the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.
the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all.
both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.
in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.
now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.
Street light not working at kulai kavinakallu 2nd street
Relevant department has to look into the matter seriously and work on it and mark the matter as closed so that its notified as closed. Its a good move for public and public workers to work hand in hand
Add new comment