Bengaluru, Apr 30: Karnataka has decided to allow all industries located outside COVID-19 containment zones to operate from May 4, Chief Minister BS Yediyurappa said Thursday, even as he cautioned that the coronavirus crisis may last another couple of months.
“We feel that the COVID-19 menace is reducing and coming under control in the state. In Bengaluru, not many cases have been reported in the last 3-4 days. If this continues, it’ll help us open up industries in and around Bengaluru also. We’ll wait for another 2-3 days,” Yediyurappa told reporters after chairing a meeting of the Cabinet.
Yediyurappa and Industries Minister Jagadish Shettar are scheduled to meet industry captains on Thursday evening to discuss resuming operations from May 4.
"It won't be a surprise if the corona continues for another 2-3 months. However, based on Prime Minister Narendra Modi's directions, stringent lockdown measures (at red zones) and reviving economic activity will go hand in hand," Yediyurappa said.
The Cabinet decided to allow one-time inter-state or inter-district movement of people and labourers stranded due to the Covid-19 lockdown. The move will also benefit students and others who want to return to their native states or districts.
The government will also allow people from Karnataka residing in other states to return only if they are tested negative for Covid-19, Law Minister JC Madhuswamy said. An official order for this will be issued by evening today.
"Expenses should be covered by those wishing to travel. The government is willing to arrange buses for their benefit," Madhuswamy said. The government will provide a license to anyone who wishes to go, he said.
Having relaxed norms for industries outside red zones to resume operations, Madhuswamy said that inter-district passes will be issued to the top management of these units to travel from their homes to workplaces.
Liquor outlets, saloons and restaurants will remain closed till May 3, after which the government will take a call based on directions issued by the Centre.
“Opening of malls and hotels is not an option before us right now. But all hotels can give parcels,” Yediyurappa said. “I’m confident that the PM will allow the resumption of all activities.
He has already said that corona (containment) and economic activities will have to go hand in hand. So, I’m expecting the Centre to make some favourable decisions,” he added.
Comments
anybody got their grevences answered here
corporation lights of cemetrey not glowing since two months. On 1st November 2019 is holy souls day. Kindly repair the lights at the earliest.
Fr. Joseph J. Lobo
Parish Priest
Street light is not working since 15 days. On 23rd July 2019 complaint lodged with Mobile No7353933410. Till date they are not responding
hello / madam
Keeping the city clean is our duty. I know not everybody is following that. We need some awareness program
to keep our city clean green and hygenic. Its our duty to keep the environment clean and place around us.
But it is also the duty of Corporation to maintain the cleanliness aroud the city, in some parts of the city like market, near clock tower circle its not been getting cleaned from past few days. Please do the needfull for betterment of tomorrow
thank you
Dear Madam, I have purchased 1 BHK flat in Green City, Vamadapadav on October, 2013 and paid full amount to builder T3 Urban Developers LTD. As per agreement possession was in December, 2015 but still building is not ready.
There were 5 buildings in Green City and at a time builder started 3 buildings construction work. I have purchased middle of the building and that building 1st floor slab only completed and since long time work stopped.
Last year builder agreed to give me flat in 1st building but building’s interior work is still pending and since 1 year work totally stopped.
Presently builder is not picking call or not responding for query. It seems that he is cheating with me. Kindly help me to resolve this issue. I will be grateful to you.
Sir/Madam,
Four street lights are not working on Raghavendra Matt Road, Hosabettu, Surathkal since long.
The roads are in Shabby condition and hence difficult in the night to Padastrians.
Kindly arrange to replace the treet lights on Main road, Raghavendra Matt Road, Hosabettu, near and after the Areca Field.
the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.
the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all.
both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.
in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.
now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.
Street light not working at kulai kavinakallu 2nd street
Relevant department has to look into the matter seriously and work on it and mark the matter as closed so that its notified as closed. Its a good move for public and public workers to work hand in hand
Add new comment