Karnataka on Saturday reported 12 new cases, the highest in a single day so far, taking the tally in the state to 76.
Late at night, the Mysuru district commissioner said five more people had tested positive in the district. But it was yet to be confirmed by the state health department.
Of the cases, 41 are from Bengaluru, eight from Chikkaballapur, while Uttara Kannada and Dakshina Kannada districts have seven each.
Interestingly, the highest number of patients are those from Dubai or those who had transit travel via Dubai. Out of 76 cases, 17 cases (22%) have travel history to Dubai, the capital of Emirate of Dubai and the most populous city in the United Arab Emirates (UAE).
Medical Education Minister Dr K Sudhakar, who is also in-charge of COVID-19 operations, said that Dubai has been a major concern as far as Karnataka COVID-19 patients are concerned. “Most of the positive cases have come through Dubai suggesting something amiss there,” he said.
Echoing the same, Dr Prakash Kumar, Joint Director, Communicable Diseases, Department of Health and Family Welfare, said, “The layover in Dubai is around six to seven hours. We are seeing Dubai to be the new epicentre of the virus as far as India is concerned.”
UAE was initially not on the list of countries from where passengers were screened. It was added much later when clusters of patients with travel history to Dubai began popping up all over the country.
Patient-19 has infected the maximum so far.
Out of the 12 cases that tested positive on Saturday, five are contacts of Patient 19. All of them are being treated at a Chikkaballapur hospital. Two of them are from Hindupur, Andhra Pradesh, and three are residents of Gauribidanur taluk in Chikkabalapur district.
P19, a 31-year-old man from Chikkaballapur, had travelled to Mecca, Saudi Arabia, and returned to India on March 14. Existing patient clusters suggest that P19 had infected the maximum number of people. Officials did not reveal how many people he originally travelled with to Mecca.
Amid the rise in cases, Jawaid Akhtar, Additional Chief Secretary (Health), maintained that the state had not reached stage 3. But he had no definitive answer as to how the Mysuru patient contracted the virus despite health officials he was in touch with not testing positive.
Health Commissioner Pankaj Kumar Pandey said around 1,000 primary contacts of all positive cases have been classified as high-risk and low-risk. The high-risk patients are in government hospitals while the low-risk ones in quarantine facilities.
Comments
anybody got their grevences answered here
corporation lights of cemetrey not glowing since two months. On 1st November 2019 is holy souls day. Kindly repair the lights at the earliest.
Fr. Joseph J. Lobo
Parish Priest
Street light is not working since 15 days. On 23rd July 2019 complaint lodged with Mobile No7353933410. Till date they are not responding
hello / madam
Keeping the city clean is our duty. I know not everybody is following that. We need some awareness program
to keep our city clean green and hygenic. Its our duty to keep the environment clean and place around us.
But it is also the duty of Corporation to maintain the cleanliness aroud the city, in some parts of the city like market, near clock tower circle its not been getting cleaned from past few days. Please do the needfull for betterment of tomorrow
thank you
Dear Madam, I have purchased 1 BHK flat in Green City, Vamadapadav on October, 2013 and paid full amount to builder T3 Urban Developers LTD. As per agreement possession was in December, 2015 but still building is not ready.
There were 5 buildings in Green City and at a time builder started 3 buildings construction work. I have purchased middle of the building and that building 1st floor slab only completed and since long time work stopped.
Last year builder agreed to give me flat in 1st building but building’s interior work is still pending and since 1 year work totally stopped.
Presently builder is not picking call or not responding for query. It seems that he is cheating with me. Kindly help me to resolve this issue. I will be grateful to you.
Sir/Madam,
Four street lights are not working on Raghavendra Matt Road, Hosabettu, Surathkal since long.
The roads are in Shabby condition and hence difficult in the night to Padastrians.
Kindly arrange to replace the treet lights on Main road, Raghavendra Matt Road, Hosabettu, near and after the Areca Field.
the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.
the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all.
both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.
in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.
now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.
Street light not working at kulai kavinakallu 2nd street
Relevant department has to look into the matter seriously and work on it and mark the matter as closed so that its notified as closed. Its a good move for public and public workers to work hand in hand
Add new comment