The euphoria over the claim that around 3,000 tonnes of gold reserves, worth Rs 12 trillion, have been discovered in Uttar Pradesh’s Sonbhadra district could not last even 24 hours, with the Geological Survey of India (GSI) clarifying on Saturday there had been no such discovery.
The GSI, headquartered in Kolkata, rebutted the claims of the Uttar Pradesh Directorate of Geology and Mining (UPDGM), and said “miscommunication” must have led to the wrong reporting of facts.
M Sridhar, director general of the GSI, said nobody in the agency gave any such data. He said 52,806 tonnes of gold ore was found in Sonbhadra district during the exploration work in 1998-2000. From this reserve, only 160 kg of gold can be extracted.
“There must have been some miscommunication of facts because of which the gold ore deposits have been overestimated. We have written a letter to Uttar Pradesh (UPDGM), stating the facts. The GSI has not estimated such kind of vast resource of gold deposits in Sonbhadra,” Sridhar said.
ALSO READ: 2,900-tonne gold mine found in Sonbhadra, 4 times that of India's reserves
The UPDGM had said on Friday that gold deposits were found in Son Pahadi and Hardi areas of the district. Sridhar said while gold ore was found in the area during the GSI’s exploration work in 1998-2000, it had told the state government about the discovery in November last year.
Under the new regulation, which came into effect from 2015, the GSI has to inform the state government when ore deposits are discovered. Earlier, no such action was mandatory. In its report, the GSI estimated that only 3.03 gm of gold can be extracted from a tonne of ore. It also clarified that even the extraction amount was tentative and could not be established for certain.
Moreover, Sridhar said the deposits were spread across only 0.5 sq km in forest land, which made the mining of ore economically unviable. “When there are several mines nearby, we can club it into a block and then it makes sense to mine the ore. But in this case, the deposits are too small to make it viable for any company to mine it,” he said. The GSI usually prioritises its exploration work based on the needs of the Centre. While strategic minerals like tin, cobalt, lithium, beryllium, germanium, gallium, indium, tantalum, niobium, selenium, and bismuth are atop the list in GSI exploration, gold is another commodity on its priority list.
According to the World Gold Council, India has reserves of 630 tonnes of gold.
Comments
anybody got their grevences answered here
corporation lights of cemetrey not glowing since two months. On 1st November 2019 is holy souls day. Kindly repair the lights at the earliest.
Fr. Joseph J. Lobo
Parish Priest
Street light is not working since 15 days. On 23rd July 2019 complaint lodged with Mobile No7353933410. Till date they are not responding
hello / madam
Keeping the city clean is our duty. I know not everybody is following that. We need some awareness program
to keep our city clean green and hygenic. Its our duty to keep the environment clean and place around us.
But it is also the duty of Corporation to maintain the cleanliness aroud the city, in some parts of the city like market, near clock tower circle its not been getting cleaned from past few days. Please do the needfull for betterment of tomorrow
thank you
Dear Madam, I have purchased 1 BHK flat in Green City, Vamadapadav on October, 2013 and paid full amount to builder T3 Urban Developers LTD. As per agreement possession was in December, 2015 but still building is not ready.
There were 5 buildings in Green City and at a time builder started 3 buildings construction work. I have purchased middle of the building and that building 1st floor slab only completed and since long time work stopped.
Last year builder agreed to give me flat in 1st building but building’s interior work is still pending and since 1 year work totally stopped.
Presently builder is not picking call or not responding for query. It seems that he is cheating with me. Kindly help me to resolve this issue. I will be grateful to you.
Sir/Madam,
Four street lights are not working on Raghavendra Matt Road, Hosabettu, Surathkal since long.
The roads are in Shabby condition and hence difficult in the night to Padastrians.
Kindly arrange to replace the treet lights on Main road, Raghavendra Matt Road, Hosabettu, near and after the Areca Field.
the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.
the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all.
both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.
in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.
now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.
Street light not working at kulai kavinakallu 2nd street
Relevant department has to look into the matter seriously and work on it and mark the matter as closed so that its notified as closed. Its a good move for public and public workers to work hand in hand
Add new comment