Kasaragod, Jul 26: First funeral, now wedding. Forty-three persons who attended a wedding at Pilankatta in Chengala panchayat in Kasaragod on July 17 have tested positive for Covid-19, said district medical officer (DMO) A V Ramdas.
They include the bride and the groom. Collector D Sajith Babu has asked all those who attended the wedding to go into home quarantine for 14 days. Those with Covid symptoms should get in touch with the nearest primary health centre, he said.
The DMO said samples of 128 persons linked to the wedding were tested, of which 43 turned out positive. Earlier, 44 persons who attended a funeral in Cherkala in the first week of July had tested positive. The funeral was declared a cluster and the government had to test 522 persons linked to the funeral.
The collector said those taking part in funeral or weddings without following the Covid protocol would be booked under the Kerala Epidemic Diseases Act. If convicted, they would face up to two years of rigorous imprisonment and a fine of `10,000. Kasaragod police said they will register a case in connection with the wedding.
Pilankatta ward member Abdulla Kunhi K B said it was not a big fat wedding. The ceremony held at the bride’s house at Pilankatta was attended by less than 100 people, he said.“Theirs is a big family with four houses in one compound.
As many as 30 members are staying in these houses,” said Kunhi. Nine of the 30 have tested positive.Of the 15 guests, who came from the bride’s mother’s house, 12 contracted the infection. “The rest of the infected persons were among the groom’s guests,” said Kunhi, who did not attend the wedding. The groom and the bride’s father returned from Dubai three months ago.
1,049: state records biggest recovery
A total of 1,049 Covid patients recovered on Saturday. This is the first time that the number of recoveries crossed the 1,000-mark in the state. The previous highest was 968 reported on Friday. So far, as many as 8,613 patients have recovered.
roping in ayush experts a challenge
Plan to bring AYUSH practitioners for treating positive patients at CFLTCs is going to be a challenge for the government. It turned out that respective associations were planning to approach the government with an individual charter of demands.
Comments
anybody got their grevences answered here
corporation lights of cemetrey not glowing since two months. On 1st November 2019 is holy souls day. Kindly repair the lights at the earliest.
Fr. Joseph J. Lobo
Parish Priest
Street light is not working since 15 days. On 23rd July 2019 complaint lodged with Mobile No7353933410. Till date they are not responding
hello / madam
Keeping the city clean is our duty. I know not everybody is following that. We need some awareness program
to keep our city clean green and hygenic. Its our duty to keep the environment clean and place around us.
But it is also the duty of Corporation to maintain the cleanliness aroud the city, in some parts of the city like market, near clock tower circle its not been getting cleaned from past few days. Please do the needfull for betterment of tomorrow
thank you
Dear Madam, I have purchased 1 BHK flat in Green City, Vamadapadav on October, 2013 and paid full amount to builder T3 Urban Developers LTD. As per agreement possession was in December, 2015 but still building is not ready.
There were 5 buildings in Green City and at a time builder started 3 buildings construction work. I have purchased middle of the building and that building 1st floor slab only completed and since long time work stopped.
Last year builder agreed to give me flat in 1st building but building’s interior work is still pending and since 1 year work totally stopped.
Presently builder is not picking call or not responding for query. It seems that he is cheating with me. Kindly help me to resolve this issue. I will be grateful to you.
Sir/Madam,
Four street lights are not working on Raghavendra Matt Road, Hosabettu, Surathkal since long.
The roads are in Shabby condition and hence difficult in the night to Padastrians.
Kindly arrange to replace the treet lights on Main road, Raghavendra Matt Road, Hosabettu, near and after the Areca Field.
the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.
the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all.
both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.
in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.
now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.
Street light not working at kulai kavinakallu 2nd street
Relevant department has to look into the matter seriously and work on it and mark the matter as closed so that its notified as closed. Its a good move for public and public workers to work hand in hand
Add new comment