Bengaluru, May 17: Left to itself, Karnataka will look to spring back towards normalcy under Lockdown 4.0 as the state government is on standby to resume public transport services from May 18, if the Centre allows it.
Though KSRTC and BMTC have been preparing for resumption of services, officials in the two corporations told DH that they cannot make a move till the government makes a decision.
Transport Commissioner N Shivakumar said the department will take a decision based on the state government's orders. "The government will take a call on buses as well as taxi and other transport services," he said.
Senior officials in the state government said Deputy Chief Minister and Transport Minister Laxman Savadi has written to Union Minister for Road Transport and Highways Nitin Gadkari seeking a nod for resumption of the services.
Transport Secretary Gaurav Gupta has written a separate letter to his counterpart in the Union government requesting permission to operate public transport. "The state government wants the services to open. The official has listed out the steps the corporations will take to ensure social distancing other steps that will be taken to check spread of Coronavirus," a source said.
The B S Yediyurappa administration has been bullish on easing lockdown restrictions.
If the Centre empowers the states to define Lockdown 4.0, Karnataka is likely to do away with the red-orange-green zoning of districts and allow public services to resume, except in COVID-19 containment zones. The government is also likely to redefine its containment strategy by micromanaging localities where COVID-19 cases are reported, without letting life in an entire district get affected.
The government has already shown willingness to allow hotels and gyms to open after May 17 subject to social distancing norms and restrictions. In fact, the government has proposed to allow the resumption of all economic activities in standalone establishments. The government, however, is not keen on opening malls, theatres, diners and establishments that have centralized air conditioning.
“Everything depends on the Centre,” Deputy Chief Minister CN Ashwath Narayan said. “Our only stand is that the red zone should be treated at par with the other zone when it comes to relaxation.”
Comments
anybody got their grevences answered here
corporation lights of cemetrey not glowing since two months. On 1st November 2019 is holy souls day. Kindly repair the lights at the earliest.
Fr. Joseph J. Lobo
Parish Priest
Street light is not working since 15 days. On 23rd July 2019 complaint lodged with Mobile No7353933410. Till date they are not responding
hello / madam
Keeping the city clean is our duty. I know not everybody is following that. We need some awareness program
to keep our city clean green and hygenic. Its our duty to keep the environment clean and place around us.
But it is also the duty of Corporation to maintain the cleanliness aroud the city, in some parts of the city like market, near clock tower circle its not been getting cleaned from past few days. Please do the needfull for betterment of tomorrow
thank you
Dear Madam, I have purchased 1 BHK flat in Green City, Vamadapadav on October, 2013 and paid full amount to builder T3 Urban Developers LTD. As per agreement possession was in December, 2015 but still building is not ready.
There were 5 buildings in Green City and at a time builder started 3 buildings construction work. I have purchased middle of the building and that building 1st floor slab only completed and since long time work stopped.
Last year builder agreed to give me flat in 1st building but building’s interior work is still pending and since 1 year work totally stopped.
Presently builder is not picking call or not responding for query. It seems that he is cheating with me. Kindly help me to resolve this issue. I will be grateful to you.
Sir/Madam,
Four street lights are not working on Raghavendra Matt Road, Hosabettu, Surathkal since long.
The roads are in Shabby condition and hence difficult in the night to Padastrians.
Kindly arrange to replace the treet lights on Main road, Raghavendra Matt Road, Hosabettu, near and after the Areca Field.
the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.
the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all.
both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.
in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.
now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.
Street light not working at kulai kavinakallu 2nd street
Relevant department has to look into the matter seriously and work on it and mark the matter as closed so that its notified as closed. Its a good move for public and public workers to work hand in hand
Add new comment