Tumakuru, Jan 3: Chief Minister B.S. Yediyurappa, who has drawn flak for the Centre releasing “inadequate” flood relief to the State, on Thursday asked Prime Minister Narendra Modi for additional relief during his speech at a farmers’ convention in Tumakuru.
The Chief Minister even said, “I have brought this to the notice of the Prime Minister three or four times, but till now no additional relief has been sanctioned. I request him with folded hands to release it soon,” in Kannada. The Prime Minister, who spoke later at the event, however, did not respond to the Chief Minister’s request in his speech.
Mr. Yediyurappa said the State had witnessed losses to the tune of over ₹30,000 crore because of floods.
‘Stress on irrigation’
Addressing farmers at one of his main support bases of Tumakuru, the Lingayat strongman advised the Prime Minister that his dream of doubling farmers’ income by 2023 could become a reality only if he focused on “providing scientific price to farm produce, bringing water to farms through irrigation, and by interlinking rivers”.
Mr. Yediyurappa’s remarks made at a programme to release the fourth instalment of the Pradhan Mantri Kisan Samman Yojana, a farm subsidy cash transfer scheme of the Union government, have raised eyebrows.
Stressing on the key role of irrigation schemes in farmers’ welfare, he sought a special package of ₹50,000 crore for completion of long-pending projects in Karnataka.
The five-minute-long speech is being seen as an attempt by the Chief Minister to assert himself within the party by publicly putting even the Prime Minister on the mat. This comes in the wake of the BJP suffering defeats in multiple States and the party’s victory in the recent bypolls in the State under Mr. Yediyurappa’s leadership, both of which have only strengthened the Chief Minister, sources in the party said. “We are curious as to how the party high command will now deal with this public assertion in front of the Prime Minister,” a senior party leader said.
The Chief Minister has been reportedly “deeply unhappy” over the delay in the flood relief by the Union government and also the “inadequate” amount released. The Opposition has attacked him over lack of adequate Central relief, which was interpreted as the BJP central leadership’s reported unhappiness with him. The Chief Minister had then said he was doing a “tightrope walk”.
After a delay of over two months, the Centre released ₹1,200 crore as flood relief in October 2019.
Comments
anybody got their grevences answered here
corporation lights of cemetrey not glowing since two months. On 1st November 2019 is holy souls day. Kindly repair the lights at the earliest.
Fr. Joseph J. Lobo
Parish Priest
Street light is not working since 15 days. On 23rd July 2019 complaint lodged with Mobile No7353933410. Till date they are not responding
hello / madam
Keeping the city clean is our duty. I know not everybody is following that. We need some awareness program
to keep our city clean green and hygenic. Its our duty to keep the environment clean and place around us.
But it is also the duty of Corporation to maintain the cleanliness aroud the city, in some parts of the city like market, near clock tower circle its not been getting cleaned from past few days. Please do the needfull for betterment of tomorrow
thank you
Dear Madam, I have purchased 1 BHK flat in Green City, Vamadapadav on October, 2013 and paid full amount to builder T3 Urban Developers LTD. As per agreement possession was in December, 2015 but still building is not ready.
There were 5 buildings in Green City and at a time builder started 3 buildings construction work. I have purchased middle of the building and that building 1st floor slab only completed and since long time work stopped.
Last year builder agreed to give me flat in 1st building but building’s interior work is still pending and since 1 year work totally stopped.
Presently builder is not picking call or not responding for query. It seems that he is cheating with me. Kindly help me to resolve this issue. I will be grateful to you.
Sir/Madam,
Four street lights are not working on Raghavendra Matt Road, Hosabettu, Surathkal since long.
The roads are in Shabby condition and hence difficult in the night to Padastrians.
Kindly arrange to replace the treet lights on Main road, Raghavendra Matt Road, Hosabettu, near and after the Areca Field.
the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.
the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all.
both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.
in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.
now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.
Street light not working at kulai kavinakallu 2nd street
Relevant department has to look into the matter seriously and work on it and mark the matter as closed so that its notified as closed. Its a good move for public and public workers to work hand in hand
Add new comment