New Delhi, August 17: Three key CAG reports were tabled in Parliament on Friday indicting the government of causing a combined loss of crores of rupees to the national exchequer.

The much-awaited CAG report on coal block allotment said private firms are likely to gain Rs 1.86 lakh crore from coal blocks that were allocated to them on nomination basis instead of competitive bidding.

The audit report on Delhi airport slams the levy of development fee on passengers and says the civil aviation ministry violated the bid conditions for the benefit of GMR-led DIAL to the tune of over Rs 3,415 crore.

The third CAG report flays post-bid concessions to Reliance Power and says the Anil Ambani-led firm got undue benefit of Rs 29,033 crore when the government allowed use of surplus coal from blocks alloted to Sasan power plant for its other projects.

Reacting to the CAG reports, minister of state in Prime Minister's office V Narayanasamy said that the govt auditor was not following its mandate.

Meanwhile, the BJP demanded resignation of the government alleging that scams in the coal, power and airport sectors had exposed the "loot and plunder" of the country. "

The party sought Prime Minister's resignation as he headed the coal ministry at the time of alleged irregularities.

Government is badly exposed by the three CAG reports on power, coal and Delhi airport. The magnitude of these scams, according to the CAG report, is between Rs 1.6 and 1.86 lakh crore," BJP spokesperson Prakash Javadekar told reporters outside Parliament.

CAG's coal report

The CAG in its report, tabled in Parliament, names 25 companies including Essar Power, Hindalco, Tata Steel, Tata Power and Jindal Steel and Power which have got the blocks in various states.

"Delay in introduction of the process of competitive bidding has rendered the existing process beneficial to the private companies. Audit has estimated financial gains to the tune of Rs 1.86 lakh crore likely to accrue to private coal block allottees," CAG said in a report on allocation of coal blocks. The CAG said it has arrived at the estimates based on the average cost of production and average sale price of opencast mines of Coal India in the year 2010-11.

"A part of this financial gain could have accrued to the national exchequer by operationalising the decision taken years earlier to introduce competitive bidding for allocation of coal blocks," CAG said.

The auditing body said it is "of strong opinion that there is a need for strict regulatory and monitoring mechanism to ensure that benefit of cheaper coal is passed on consumers".

The concept of allocation of captive coal blocks through competitive bidding was announced in 2004. However, government is yet to finalise the modus operandi of competitive bidding.

CIL suffered 116 MT output loss due to delays in projects: CAG

The world's largest miner Coal India (CIL) suffered production losses to the tune of 116 million tonnes (MT) on account of delays in execution of new projects, government auditor CAG has said.

Delays ranging from "one to 12 years" in execution of 32 projects under different subsidiaries of CIL entailed "loss of production by 115.95 MT," CAG said in its report on "Allocation of Coal Blocks and Augmentation of Coal Production".

The delays, it said, pertained to "problems of land acquisition, forest clearance, adverse geo-mining condition, tender finalisation for equipment of and construction of Coal Handling Plant (CHP) and railway siding," it said.

CAG observed that delays took place despite an expert committee emphasising way back in 2005 the need for setting up of a permanent special task force to monitor progress of clearances and project implementation of schemes to be completed by the end of XIth Five Year Plan (2007-12).

"In order to bridge the demand-supply gap of coal, new coal projects are required to be completed in a time bound manner," it said.

However, the coal ministry stated in January, 2012 that "response from ministry of environment and forest is awaited."

Noting that CIL could not match with the rate of increase in coal production due to delays in execution of augmentation of projects on account of "lack of coordinated and planned approach by various government agencies involved in statutory clearances and land execution," CAG asked CIL to fix output targets in line with the targets by the Planning Commission.

State-run Coal India is the largest domestic producer of dry-fuel and accounts for over 80 per cent of the total domestic production.

CAG's report on Delhi airport

CAG in its audit report on Indira Gandhi International Airport that was tabled in Parliament, said DIAL can potentially earn Rs 1,63,557 crore over a 60-year period from the land given to it on a lease of Rs 100 per annum.

Allowing DIAL to levy development fee vitiated the sanctity of bidding process and led to undue benefit of Rs 3,415.35 crore to the private firm, it said.

GMR Infrastructure holds 54 per cent stake in Delhi International Airport Ltd (DIAL).

"It was noticed that ministry of civil aviation and Airport Authority of India, on some occasions, violated the provisions of the transaction documents in the interest of the concessionaire," the official auditor said.

CAG said contrary to provision of the airport concession agreement, DIAL was allowed to use the amount collected as development fees to meet the project costs.

"In face, only 19 per cent of the project cost came from equity, approximately 42 per cent came from debt. The remaining project costs were met from security deposits and development fees".

"Whenever DIAL raised an issue regarding revenue to accrue to it or expenditure to be debited to government in contravention to the provisions of Operation Management Development Agreement (OMDA), the ministry and AAI interpreted the provisions always in favour of the operators and against the interest of the government," it said.

CAG report on Reliance Power

Flaying post-bid concessions to Reliance Power, the CAG has said the Anil Ambani-led firm got undue benefit of Rs 29,033 crore when the government allowed use of surplus coal from blocks alloted to Sasan power plant for its other projects.

CAG in its report tabled in Parliament said subsequent to award of the 4,000 MW Sasan ultra mega power project to RPL, the government granted permission to the company to utilise the surplus coal from three mines attached to the projects for the group's Chitrangi project in Madhya Pradesh.

"A reading of all the clauses in the allocation letters together conveyed that clauses were inserted in the coal allocation letter as a safegaurd measure to prevent misuse of coal by the developer. The permission to use surplus coal in other projects of the bidder after award of the contract based on acceptance of the lowest tariff, vitiated the sanctity of the bidding process which would result in post bid concessions to the developer having significant financial implication," it said.

CAG said the permission to use of excess coal from Moher, Moher Amlohri and Chhatrasal blocks allocated to RPL's Sasan power project after its award "not only vitiated the bidding process but also resulted in undue benefit to RPL".

"This decision resulted in financial benefit of Rs 29,033 crore with a net present value of Rs 11,852 crore to the project developer (RPL)," the official auditor said.

CAG said it was not clear how power ministry in October 2006 came to the conclusion that two initially allocated blocks for the Sasan project (Moher and Moher Amlohri) would be inadequate to fire the 4,000 MW plant.

"The basis on which ministry of coal was prevailed upon in October 2006 itself to allot an additional block (Chhatrasal) of coal to Sasan ultra mega power project by de-allocating it from the public sector NTPC is not clear," it said.


Normal 0 false false false EN-US X-NONE X-NONE

CAG reports slam UPA government, BJP demands PM's resignation

New Delhi, August 17: Three key CAG reports were tabled in Parliament on Friday indicting the government of causing a combined loss of crores of rupees to the national exchequer.

The much-awaited CAG report on coal block allotment said private firms are likely to gain Rs 1.86 lakh crore from coal blocks that were allocated to them on nomination basis instead of competitive bidding.

The audit report on Delhi airport slams the levy of development fee on passengers and says the civil aviation ministry violated the bid conditions for the benefit of GMR-led DIAL to the tune of over Rs 3,415 crore.

The third CAG report flays post-bid concessions to Reliance Power and says the Anil Ambani-led firm got undue benefit of Rs 29,033 crore when the government allowed use of surplus coal from blocks alloted to Sasan power plant for its other projects.

Reacting to the CAG reports, minister of state in Prime Minister's office V Narayanasamy said that the govt auditor was not following its mandate.

Meanwhile, the BJP demanded resignation of the government alleging that scams in the coal, power and airport sectors had exposed the "loot and plunder" of the country. "

The party sought Prime Minister's resignation as he headed the coal ministry at the time of alleged irregularities.

Government is badly exposed by the three CAG reports on power, coal and Delhi airport. The magnitude of these scams, according to the CAG report, is between Rs 1.6 and 1.86 lakh crore," BJP spokesperson Prakash Javadekar told reporters outside Parliament.

CAG's coal report

The CAG in its report, tabled in Parliament, names 25 companies including Essar Power, Hindalco, Tata Steel, Tata Power and Jindal Steel and Power which have got the blocks in various states.

"Delay in introduction of the process of competitive bidding has rendered the existing process beneficial to the private companies. Audit has estimated financial gains to the tune of Rs 1.86 lakh crore likely to accrue to private coal block allottees," CAG said in a report on allocation of coal blocks. The CAG said it has arrived at the estimates based on the average cost of production and average sale price of opencast mines of Coal India in the year 2010-11.

"A part of this financial gain could have accrued to the national exchequer by operationalising the decision taken years earlier to introduce competitive bidding for allocation of coal blocks," CAG said.

The auditing body said it is "of strong opinion that there is a need for strict regulatory and monitoring mechanism to ensure that benefit of cheaper coal is passed on consumers".

The concept of allocation of captive coal blocks through competitive bidding was announced in 2004. However, government is yet to finalise the modus operandi of competitive bidding.

CIL suffered 116 MT output loss due to delays in projects: CAG

The world's largest miner Coal India (CIL) suffered production losses to the tune of 116 million tonnes (MT) on account of delays in execution of new projects, government auditor CAG has said.

Delays ranging from "one to 12 years" in execution of 32 projects under different subsidiaries of CIL entailed "loss of production by 115.95 MT," CAG said in its report on "Allocation of Coal Blocks and Augmentation of Coal Production".

The delays, it said, pertained to "problems of land acquisition, forest clearance, adverse geo-mining condition, tender finalisation for equipment of and construction of Coal Handling Plant (CHP) and railway siding," it said.

CAG observed that delays took place despite an expert committee emphasising way back in 2005 the need for setting up of a permanent special task force to monitor progress of clearances and project implementation of schemes to be completed by the end of XIth Five Year Plan (2007-12).

"In order to bridge the demand-supply gap of coal, new coal projects are required to be completed in a time bound manner," it said.

However, the coal ministry stated in January, 2012 that "response from ministry of environment and forest is awaited."

Noting that CIL could not match with the rate of increase in coal production due to delays in execution of augmentation of projects on account of "lack of coordinated and planned approach by various government agencies involved in statutory clearances and land execution," CAG asked CIL to fix output targets in line with the targets by the Planning Commission.

State-run Coal India is the largest domestic producer of dry-fuel and accounts for over 80 per cent of the total domestic production.

CAG's report on Delhi airport

CAG in its audit report on Indira Gandhi International Airport that was tabled in Parliament, said DIAL can potentially earn Rs 1,63,557 crore over a 60-year period from the land given to it on a lease of Rs 100 per annum.

Allowing DIAL to levy development fee vitiated the sanctity of bidding process and led to undue benefit of Rs 3,415.35 crore to the private firm, it said.

GMR Infrastructure holds 54 per cent stake in Delhi International Airport Ltd (DIAL).

"It was noticed that ministry of civil aviation and Airport Authority of India, on some occasions, violated the provisions of the transaction documents in the interest of the concessionaire," the official auditor said.

CAG said contrary to provision of the airport concession agreement, DIAL was allowed to use the amount collected as development fees to meet the project costs.

"In face, only 19 per cent of the project cost came from equity, approximately 42 per cent came from debt. The remaining project costs were met from security deposits and development fees".

"Whenever DIAL raised an issue regarding revenue to accrue to it or expenditure to be debited to government in contravention to the provisions of Operation Management Development Agreement (OMDA), the ministry and AAI interpreted the provisions always in favour of the operators and against the interest of the government," it said.

CAG report on Reliance Power

Flaying post-bid concessions to Reliance Power, the CAG has said the Anil Ambani-led firm got undue benefit of Rs 29,033 crore when the government allowed use of surplus coal from blocks alloted to Sasan power plant for its other projects.

CAG in its report tabled in Parliament said subsequent to award of the 4,000 MW Sasan ultra mega power project to RPL, the government granted permission to the company to utilise the surplus coal from three mines attached to the projects for the group's Chitrangi project in Madhya Pradesh.

"A reading of all the clauses in the allocation letters together conveyed that clauses were inserted in the coal allocation letter as a safegaurd measure to prevent misuse of coal by the developer. The permission to use surplus coal in other projects of the bidder after award of the contract based on acceptance of the lowest tariff, vitiated the sanctity of the bidding process which would result in post bid concessions to the developer having significant financial implication," it said.

CAG said the permission to use of excess coal from Moher, Moher Amlohri and Chhatrasal blocks allocated to RPL's Sasan power project after its award "not only vitiated the bidding process but also resulted in undue benefit to RPL".

"This decision resulted in financial benefit of Rs 29,033 crore with a net present value of Rs 11,852 crore to the project developer (RPL)," the official auditor said.

CAG said it was not clear how power ministry in October 2006 came to the conclusion that two initially allocated blocks for the Sasan project (Moher and Moher Amlohri) would be inadequate to fire the 4,000 MW plant.

"The basis on which ministry of coal was prevailed upon in October 2006 itself to allot an additional block (Chhatrasal) of coal to Sasan ultra mega power project by de-allocating it from the public sector NTPC is not clear," it said.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
January 12,2020

Patna, Jan 12: Prashant Kishor, national vice-president of the Janata Dal (United), a key ally of the BJP-led NDA, has thanked Congress general secretary Priyanka Gandhi and former AICC chief Rahul Gandhi for their support in opposing CAA (Citizenship Amendment Act) and NRC (National Register of Citizens).

Perceived as one of the closest associates of Bihar Chief Minister Nitish Kumar, who is also the party’s national president, PK (as Prashant is fondly called) also assured the two top Congress leaders that the contentious legislation would not be implemented in Bihar where JD (U) is ruling the State with the support of the BJP.

“I join my voice with all to thank #Congress leadership for their formal and unequivocal rejection of #CAA_NRC. Both @rahulgandhi and @priyankagandhi deserve special thanks for their efforts on this count….also would like to reassure to all – CAA/NRC won’t be implemented in Bihar,” tweeted PK on Sunday.

The development assumes significance as a day back, the Congress Working Committee (CWC) meeting, chaired by Sonia Gandhi, had strongly opposed CAA/NRC/NPR as it was aimed at “sinister design of the present regime to divide Indian people into religious lines.”

The latest tweet by PK is also being seen as a rebuff to the BJP, which again recently reiterated that “the BJP should project its own chief ministerial candidate during the 2020 Bihar Assembly elections.”

The JD (U) had taken umbrage over such provocative statements by BJP leaders and asked the saffron camp to rein in its ‘loudmouths’ as BJP chief Amit Shah had already made it clear that the next Assembly polls in Bihar would be fought under the leadership of Nitish.

Of late, PK has been quite vocal about his opposition to the Centre’s policies, particularly the contentious issues of NRC and CAA. Besides, he even dubbed senior BJP leader Sushil Modi as the man who became Bihar’s Deputy Chief Minister due to ‘circumstances’ as the BJP was decisively decimated during the 2015 Assembly elections.

Nitish never reprimanded PK for his jibe against Modi, thereby giving rise to speculations whether Bihar was again heading for a political churning ahead of Assembly polls slated for October this year.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
May 5,2020

Kochi, May 5: India has sent three naval ships to evacuate its citizens stranded in the Maldives and UAE due to the COVID-19 pandemic, a defence spokesperson said in the early hours on Tuesday.

INS Jalashwa deployed off Mumbai coast, along with INS Magar, diverted for Maldives on Monday night, he said.

While INS Shardul diverted to Dubai to evacuate the expatriates, the spokesperson added.

The three ships will return to Kochi, he said.

INS Magar and INS Shardul are Southern Naval Command ships, while INS Jalashwa is from Eastern Naval Command.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
February 14,2020

London, Feb 14: Liquor tycoon Vijay Mallya once again asked the Indian banks to take back 100 per cent of the principal amount owed to them at the end of his three-day British High Court appeal on Thursday against an extradition order to India.

The 64-year-old former Kingfisher Airlines boss, wanted in India on charges of fraud and money laundering amounting to an alleged Rs 9,000 crores in unpaid bank loans, said the Enforcement Directorate (ED) and the Central Bureau of Investigation (CBI) are fighting over the same assets and not treating him reasonably in the process.

“I request the banks with folded hands, take 100 per cent of your principal back, immediately,” he said outside the Royal Courts of Justice in London.

“The Enforcement Directorate attached the assets on the complaint by the banks that I was not paying them. I have not committed any offenses under the PMLA (Prevention of Money Laundering Act) that the Enforcement Directorate should suo moto attach my assets," he said.

"I am saying, please banks take your money. The ED is saying no, we have a claim over these assets. So, the ED on the one side and the banks on the other are fighting over the same assets,” he added.

Asked about heading back to India, he noted: “I should be where my family is, where my interests are.

"If the CBI and the ED are going to be reasonable, it’s a different story. What all they are doing to me for the last four years is totally unreasonable.”

Lord Justice Stephen Irwin and Justice Elisabeth Laing, the two-member bench presiding over the appeal, concluded hearing the arguments in the case and said they will be handing down their verdict at a later date after considering the oral as well as written submissions in the “very dense” case over the next few weeks.

On a day of heated arguments between Mallya’s barrister, Clare Montgomery, and Crown Prosecution Service (CPS) counsel Mark Summers, arguing on behalf of the Indian government, both sides clashed over the prima facie case of fraud and deception against Mallya.

“We submit that he lied to get the loans, then did something with the money he wasn’t supposed to and then refused to give back the money. All this could be perceived by a jury as patently dishonest conduct,” said Summers.

“What they [Kingfisher Airlines] were saying [to the banks] about profitability going forward was knowingly wrong,” he said, as he took the High Court through evidence to counter Mallya’s lawyers’ claims that Westminster Magistrates Court Judge Emma Arbuthnot had fallen into error when she found a case to answer in the Indian courts against Mallya.

Mallya, who remains on bail on an extradition warrant, is not required to attend the hearings but has been in court to observe the proceedings since the three-day appeal opened on Tuesday. A key defence to disprove a prima facie case of fraud and misrepresentation on his part has revolved around the fact that Kingfisher Airlines was the victim of economic misfortune alongside other Indian airlines.

However, the CPS has argued that “there is enough in the 32,000 pages of overall evidence to fulfil the [extradition] treaty obligations that there is a case to answer”. “There is not just a prima facie case but overwhelming evidence of dishonesty… and given the volume and depth of evidence the District Judge [Arbuthnot] had before her, the judgment is comprehensive and detailed with the odd error but nothing that impacts the prima facie case,” said Summers.

At the start of the appeal, Mallya’s counsel claimed Arbuthnot did not look at all of the evidence because if she had, she would not have fallen into the multiple errors that permeate her judgment. The High Court must establish if the magistrates’ court had in fact fallen short on a point of law in its verdict in favour of extradition.

Representatives from the Enforcement Directorate (ED) and Central Bureau of Investigation (CBI), as well as the Indian High Commission in London, have been present in court to take notes during the course of the appeal hearing.

Mallya had received permission to appeal against his extradition order signed off by former UK home secretary Sajid Javid last February only on one ground, which challenges the Indian government's prima facie case against him of fraudulent intentions in acquiring bank loans.

At the end of a year-long extradition trial at Westminster Magistrates’ Court in London in December 2018, Judge Arbuthnot had found “clear evidence of dispersal and misapplication of the loan funds” and accepted a prima facie case of fraud and a conspiracy to launder money against Mallya, as presented by the CPS on behalf of the Indian government.

Mallya remains on bail since his arrest on an extradition warrant in April 2017 involving a bond worth 650,000 pounds and other restrictions on his travel while he contests that ruling.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.