Tipplers queue up before Kerala state run liquor outlets

News Network
March 24, 2020

Kochi, Mar 24: Long queues were witnessed in front of state beverages corporation outlets across Kerala on Tuesday despite the statewide lockdown to prevent the spread of the coronavirus.

As tipplers thronged the outlets unmindful of the curfew, officials asked them to ensure that they kept a one metre distance between them as part of preventive steps to check the COVID-19 transmission.

Official sources said precautionary measures have been taken at the beverages outlets to prevent the virus spread.

Only those wearing masks were allowed to stand in queues, the sources said.

Police were deployed to ensure that the people standing in queues keep a one metre distance between them, they added.

The opposition Congress slammed the CPI(M)-led LDF government for not taking steps to restrict crowds in front of the Kerala State Beverages Corporation (Bevco) outlets, apprehending that such a situation would pave way for spreading the virus.

Ernakulam district congress committee general secretary Sherin Varghese claimed if the government had implemented a 2017 Kerala high court order directing the beverages corporation to take remedial steps to end long queues in front of the outlets, such a situation would not have arisen.

"Had the beverages corporation complied with the court order, safety and security of persons standing in queues could have been ensured.

Now there is no protective measure to prevent the possible transmission of the coronavirus from a carrier to another person," he told PTI.

Meanwhile, the state government has directed that adequate distance be kept between people standing in queues.

Chief Minister Pinarayi Vijayan on Monday justified the decision to keep the liquor shops open citing the "peculiar" situation prevailing in the state.

Kerala is in a total lockdown since Monday midnight till March 31 to check the virus spread.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
Agencies
July 29,2020

Ambala, Jul 29: The five French Rafale fighter jets touched down at Haryana's Ambala after covering a distance of nearly 7,000 km to join the Indian Air Force.

The jets were given a customary water salute upon their arrival at the airbase, some 220-km from the India-Pakistan border.

The formal induction ceremony of the aircraft would be held later. The aircraft would move out soon to another operational base for operational sorties.

After taking off from France on Monday, the aircraft made their first stopover at a French base in the United Arab Emirates on their way to India and were refuelled by the French Air Force tanker aircraft somewhere around Greece or Israel over the sea before landing there.

The five were flown by pilots of the 17 Golden Arrows led by Commanding Officer Group Captain Harkirat Singh along with other pilots, Wing Commanders MK Singh, R Kataria, Sidhu and Arun.

The five Rafale fighter aircraft took off on Monday for India from an airbase in France. The weather in Ambala was cloudy with one or two spells of rain or thundershowers being forecasted.

India had signed a Rs 59,000-crore deal on September 23, 2016 for 36 Rafale jets from French aerospace major Dassault Aviation.

In view of Rafale fighter jets landing in the city on Wednesday, Section 144 is being imposed in four villages close to Ambala airbase. Munish Sehgal, DSP Traffic, Ambala, said the administration is on a high alert and the gathering of people on roofs and photography during landing has been strictly prohibited.

The five Rafale fighter jets had entered the Indian Airspace earlier in the day. "The Birds have entered the Indian airspace..Happy Landing in Ambala!" tweeted the Defence Minister's Office earlier on Wednesday.

The Defence Minister's Office further informed that the five Rafales were escorted by 02 SU30 MKIs as they enter the Indian airspace.

Here are the key Highlights of Rafale:

It's an Omni role aircraft.
4th Generation Fighter Jet.
It's a two-engine aircraft.
It's top speed is 2,222 Km/Hr.
It can go up to 50,000 Ft.
It's Rate of Climb is 60,000 Ft/Min.
It's Operational Range is 3,700 Km.
Ground Support.
In-depth Strike.
Anti-Ship Strike.

Reach and combat radius is 1600-1700 Kms.
Capable for Long Range standoff Mission.
Equipped with Air-to-Ground Missile System.

Specifically designed to take off from an extremely cold high altitude region.

It will also be fitted with the air-to-air beyond visual range interception combat and self-defence missile.

It can also carry the best long range air-to-land missile.

It has multi-directional radar system which can detect 40 targets at the same time in a range of over 100 Kms.

It has advance radar warning receiver to identify hostile tracking system a towed decoy system to thwart incoming missile attacks.

Rafale will ensure that our pilots will not have to cross the border to strike the target, that is about 600 Km in enemy territory.

It will get French industrial support for 50 years. 

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
Agencies
January 12,2020

Lucknow, Jan 12: The controversy over renowned Pakistani poet Faiz Ahmad Faiz's iconic poem 'Hum dekhenge' may have caused an upheaval in the literary world but it has also helped in resurrecting the famous poet for the young generations.

Students and young professionals are making a beeline for books on Faiz, his biography and his poems and book sellers are ordering supplies of Faiz books.

"Earlier, we sold hardly one book in a month or on Faiz but after the controversy, people are curious to know more about the poet and his poems. We have placed orders for the entire literary range on Faiz Ahmad Faiz," said a leading book seller in Hazratganj in Lucknow.

The bookseller said that the highest demand was for books written in Devnagri script.

"Not many in the young generation can read or write Urdu so they prefer Devnagri," the book seller said.

In Kanpur, most of the leading bookshops have already run out of stocks and book stalls in the ongoing Handloom Expo are drawing huge crowds for Faiz books.

Suchita Srivastava, B.Ed student in Kanpur said, "I have never been fond of Urdu poetry because I do not understand much of the language but after the controversy, I want to read poems of Faiz to understand what he wanted to say. I am taking help of Google to understand difficult words in Urdu."

Krishna Rao, another student at the Chandra Shekhar Azad University of Agriculture and Technology, said that since books on Faiz had been sold out, he had ordered a Kindle edition and was reading them.

"Reading his poems actually widens one's perspective of things and becomes even more precious if you take into account the time and context in which they were written," he said.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
January 28,2020

New Delhi, Jan 28: Kolkata Metro Rail Corp expects to complete its East-West project, which runs partly under the city’s iconic Hooghly river, by March 2022 after a delay of several years doubled costs.

The authority is awaiting a final installment of Rs 20 crore ($2.8 million) over the next two years from the Indian Railway Board, said Manas Sarkar, managing director at KMRC. A soft loan of Rs 4,160 crore from Japan International Cooperation Agency helps fund 48.5% of the project.

India’s oldest metro, which started in 1984 with a North-South service, was due to expand by 2014 but faced problems including squatters on the planned route. These issues have contributed to the total project cost rising to about Rs 8,600 crore for some 17 kilometers from Rs 4,900 crore for 14 km.

“About 40% of total transport demand will be tackled by these two metro services,” Sarkar said in an interview at his office in Kolkata. “It will be a relief for environmental pollution and the city should be much more decongested.”

The new line is expected to carry about 900,000 people daily, -- roughly 20% of the city’s population -- and will take less than a minute to cross a 520-meter underwater tunnel. Depending on the time of day, it takes some 20 minutes to use the ferry and anywhere upward of an hour to cross the Howrah bridge.

KMRC will repay the JICA loan over 30 years after an initial six-year moratorium. The interest rate is between 1.2% to 1.6%. The East-West metro project is 74% owned by the railway ministry and 26% by the ministry of housing and urban affairs.

“We don’t anticipate any further cost escalation now,” Sarkar said.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.