Dubai to invest $32-billion to build world's largest airport

November 30, 2014

Mumbai, Nov 30: To further secure its position as the world's aviation hub, Dubai Airports is building a whopping USD 32—billion greenfield airport at the upcoming Dubai World Central, 30 km off the present international airport which already is the second busiest in the world.dubai airport

The proposed new airport will become the world's largest aviation facility on completion and will have five runways which all will be simultaneously operational, all A380-compatible with a length of 4.5 km each.

“We are planning a USD 32—billion brand new airport at the Dubai World Central at Al Maktoum, 30 km off the present Dubai facility. In the first phase, the new airport will be able to handle 120 million passengers, which will go up to 200 million by 2020, when the project is completed,” Dubai Airports Corporate Communications Head Julius Baumann told media persons.

“On completion, the new airport will be the world's largest airport, with each concourse the size of seven football fields and have five runways which all will be simultaneously operational, all A380-compatible,” Mr. Baumann said.

The other features include 200 aircraft stands for wide bodied aircraft, four concourses connected via six airport trains to two terminals, which in turn will be linked to the city's metro network. When complete, the mega-hub will have total annual capacity exceeding 200 million passengers and 12 million tonne of freight.

The existing Al Maktoum International opened its doors to passengers on October 27, 2013 and three airlines are operating from here. It has one A380 capable runway, 64 remote stands, one cargo terminal with annual capacity for 250,000 tonne and a fully operational passenger terminal building designed to accommodate 5 million passengers annually.

The Dubai International Airport is the world's second busiest airport after the London Heathrow and is on course to become the global aviation hub, thanks to its geographical location and the availability of cheap fuel.

The first phase of the new airport includes a single A380 compatible runway, a passenger terminal with capacity of 5 million passengers which is expandable to 7 million; a cargo terminal with a capacity of 250,000 tonne per annum and expandable to 600,000 tonne and a 92-metre air traffic control tower.

The state-owned Dubai Airports already operates the Dubai International Airport in the heart of the Arabian megapolis and the Al Maktoum International Airport at the upcoming Dubai World Central (DWC).

The DWC is a 140 sq km new international city being built to de-congest the present city, Dubai Airports' Marketing & Corporate Communications Manager Zaigham Ali said, adding the work on new airport will begin early next year.

Apart from the new airport plan, the Emirate is also expanding the Dubai International Airport with a USD 7.8 billion investment to take the capacity to 100 million by 2020. This project was started in 2011 and will be completed by 2016.

The expansion of the Dubai International include a new concourse (Concourse D), expansion of Terminal 2 to twice its current capacity, refurbishment of Terminal 1, and additional aircraft stands, taxiways and aprons among others.

Dubai International, Mr. Baumann said handled 66.43 million passengers in 2013, and has being growing 15.5 per cent per annum since its launch in 1960. In 2013, it was named the second busiest airport in the world after the London Heathrow.

Mr. Ali said India is the largest source market for the airport, with an airline network that connects Dubai with 18 cities in the country.

In 2013, the airport saw a 14.3 percent increase in passenger numbers from India at 8.5 million and in the first 9 months of this year, the number has already crossed 7 million.

Mr. Ali added the company is confident of crossing the last year's mark this year.

Explaining the rationale for a gigantic new airport, Mr. Baumann said the airport's forecast figures for unconstrained passenger traffic show 126 million passengers by 2020, and 300 million passengers by 2050.

Additionally, the Terminal 2 will double in capacity by 2015. Concourse D of the airport, slated to open by mid 2015, will provide for 100 more aircraft and taking the figure up to 80 million passengers.

In all, the expansion projects will take the airport's passenger capacity to a little over 100 million passengers, Mr. Ali said.

With a built-up area of 1,972,474 sqm, the Dubai International Airport comprises three terminals and ranks among the world's top two busiest airports for international passengers, serving over 125 airlines flying to over 260 destinations, as per the Airports Council International.

On the economic impact of the aviation sector in Baumann, quoting an Oxford Economics report said, aviation will contribute USD 53.1 billion to Dubai's economy, which is 37.5 per cent to its GDP and will support over 750,000 jobs by the turn of 2020.

The aviation sector as a whole contributed USD 26.7 billion to the Dubai economy in 2013, which was almost 27 per cent of the national GDP and supported 416,500 jobs accounting for 21 per cent of the Emirates' total employment.

Passenger traffic in September totalled 5,942,628 compared to 5,407,326 recorded in the same month last year, an increase of 9.9 per cent. January—September rose 6.2 per cent to 52,422,547, up from 49,379,165, while in 2013, the passenger traffic stood 66,431,533, up 15.2 per cent from 2012.

Comments

Herman
 - 
Wednesday, 6 Apr 2016

Hello just wanted to give you a quick heads up.

The text in your post seem to be running off the screen in Opera.

I'm not sure if this is a format issue or something to do with browser compatibility but I
figured I'd post to let you know. The style and design look
great though! Hope you get the problem fixed soon.
Thanks

Also visit my web-site casio or yamaha keyboard: http://www.Aspenaftercare.com/?option=com_k2&view=itemlist&task=user&id…

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
January 25,2020

Mangaluru, Jan 25: Orange vendor Harekala Hajabba, popularly known as 'Akshara Santha' (the saint of alphabets), who went on to build a school at Newpadpu village on the city’s outskirts in 1999 is among this year’s Padma Shri awardees.

When Hajabba received the call on being nominated for the award, he was standing in a queue to buy rations.

As he is not fluent in Hindi, Hajabba handed over the phone to an auto driver, who conveyed the news that the Padma Shri award will be conferred on him.

The unlettered achiever set up a primary school from his meagre savings of Rs 150 per day,  selling oranges in Mangaluru. 

“The first time I felt bad for being an illiterate was when a foreigner enquired about the price of oranges in English. I did not know what he meant. So, I decided to start a school in my village,” Hajabba had said during a felicitation programme.

When Hajabba decided to start a school, he did not get any support. He started the school with 28 children.

The school today has been upgraded to a composite high school and is catering to the educational needs of hundreds of children in and around Newpadpu.

He ran from pillar to post in the Zilla Panchayat to make his dream come true. All cash awards he had received went into building the school. The United Christians Association, moved by the sight of his dilapidated house, built a 760-square-foot house costing Rs 15 lakh for him. 

Hajabba’s life was prescribed for the syllabus of three universities - Davangere, Kuvempu and Mangalore. His success story is also included in a Tulu textbook.

He won the Karnataka Rajyotsava award in 2013, Real Heroes award from TV channel CNN-IBN.

Hajabba, when contacted, said he could not believe his ears when told about the award.

New dreams

The frail vendor, in his 60s, humbly declared that he could achieve all this because of the support of all. Hajabba now dreams of upgrading the school into a full-fledged PU college.

Comments

Meethal Kasaragod
 - 
Sunday, 26 Jan 2020

A big Salute to him!

Great effort,

fairman
 - 
Sunday, 26 Jan 2020

Where there is will, there is way

May God help him.

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
April 22,2020

Mangaluru, Apr 22: A team of officials raided the Big Bags International Pvt Ltd premises here on Tuesday following the apprehensions expressed by locals that the company has violated lockdown rules by resuming operations on April 20.

On Monday several workers of the firm from Kerala, Tumakuru and Bengaluru were reported to be at the premises to resume operations.

The raiding team asked the management to temporarily shut down operations and asked the workers to leave the place.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
May 6,2020

Bengaluru, May 6: More than a month after international flights have been barred, Karnataka government is preparing to quarantine all 10,823 of the state''s people poised to return home from overseas amid the Covid pandemic, an official said on Tuesday.

"The state has planned to quarantine all 10,823 passengers coming back to Karnataka. The quarantine guidelines framed as below would be applicable," said Health Commissioner Pankaj Kumar Pandey in a statement.

According to the Government of India, 10,823 Karnataka residents have been stranded abroad by April 30, comprising 4,408 tourists, 3,074 students, 2,784 migrants and professionals and 557 ship crew.

Out of the 10,823 people, the state government is expecting 6,100 to return early as the government has decided to allow Indians stuck abroad to return.

"All the passengers arriving at points of entry (airports and seaports) will be compulsorily screened for symptoms of Covid-19," said Pandey.

Point of entry screening will include self-reporting form verification, thermal screening, pulse oximeter reading, briefing with instructions, categorisation, stamping for some and downloading of Aarogya Setu, Quarantine Watch and Apthamitra apps.

Arriving passengers are also required to declare existing comorbidities such hypertension, diabetes, asthma or any lung disease, organ transplantations, cancer, tuberculosis and other ailments.

Passengers will be categorised into three groups: Category A (symptomatic on arrival), Category B (asymptomatic with co-morbidity or aged above 60 years) and Category C (rest of asymptomatic passengers).

Depending on the category into which the people fall, their quarantine place and time will be determined.

Category A arrivals will be subjected to institutional quarantine for a fortnight, Category B one week quarantine at a hotel or hostel, followed by another week at home, and Category C home quarantine for a fortnight.

Karnataka government is making elaborate arrangements and logistical means, deploying healthcare, police and several other departments into action to handle the huge influx of Kannadigas and state residents.

Pandey has issued a 21-page elaborate standard operating procedure (SOP) guidelines on how to face the international returnees.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.